To develop a project for new construction, reconstruction or major repairs, it is required to develop project documentation. The composition of the design documentation is regulated by Decree No. 87 "On the composition of sections of design documentation and requirements for their content."
All projects can be divided into 2 categories: capital construction objects and linear objects.
Capital construction objects include various buildings and structures that have an aboveground and (or) underground part, which includes premises, engineering support networks and engineering support systems and is intended for the residence and (or) activities of people, the location of production, storage of products or keeping animals.
Capital construction objects do not include temporary buildings. Temporary buildings do not require an examination at all, therefore, requirements for the composition of project documentation are not imposed on it.
Temporary buildings and a capital construction option have similar external features, while, according to the Urban Planning Code of Russia, technical differences of objects are determined:
- The object of the capital characteristics of construction is tied to a permanent foundation, while there is always a link to the land plot. A temporary building may not have a foundation.
- A capital object involves the collection of permits for operation in full, while a temporary building has a minimum set of documents for an operation permit.
- The minimum service life for an object of the category KS (capital construction) is 25 years, and may be over 100 years. Temporary buildings should be operated for no more than 25 years, with a prerequisite for demolition.
- A capital object cannot be demolished, moved to another location, with the exception of a number of provisions of the town planning code.
- The object of completed construction works involves the use of ownership with registration in Rosreestr, for temporary buildings, restrictive permissive functions of ownership are presented.
Linear facilities include: power lines, communication lines (including line-cable structures), pipelines, highways, railway lines, bridges, overpasses, pedestrian crossings and other similar structures.
If a linear facility includes buildings and structures that relate to capital construction, then a project for a linear structure is developed in accordance with the list of sections for a linear structure and separately projects of buildings and structures in accordance with the requirements for sections on capital construction. Section 4 of the linear facility provides a list, characteristics and links to building designs that are part of the infrastructure of the linear facility.
Composition of design documentation for a capital construction object:
Section 2 "Scheme of the planning organization of the land plot" (ROM)
Section 3 "Architectural solutions" (AR)
Section 4 "Constructive and space-planning solutions" (KR)
Section 5 "Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions"
This section consists of subsections:
a) subsection "Power supply system" (IOS1);
b) subsection "Water supply system" (IOS2);
c) subsection "Water disposal system" (IOS3);
d) subsection "Heating, ventilation and air conditioning, heating networks" (IOS4);
e) subsection "Communication networks" (IOS5);
f) subsection "Gas supply system" (IOS6);
g) subsection "Technological solutions" (IOS7).
Section 6 "Construction management project" (PIC)
Section 7 "Project for the organization of work on the demolition or dismantling of capital construction facilities"
Section 8 "List of measures for environmental protection" (EP)
Section 9 "Measures to ensure fire safety" (PB)
Section 10 "Measures to ensure access for persons with disabilities" (ODI)
Section 10 (1) "Measures to ensure compliance with energy efficiency requirements and requirements for equipping buildings, structures and structures with metering devices for energy resources used" (EE)
Section 11 "Estimates for the construction of capital construction facilities" (CM)
Section 12 "Other documentation in cases stipulated by federal laws"
Composition of design documentation for linear objects:
Section 1 "Explanatory Note" (PZ)
Section 2 "Design of the right-of-way" (ROW)
Section 3 “Technological and constructive solutions of a linear object. Artificial structures "(TKR)
Section 4 "Buildings, structures and structures included in the infrastructure of a linear object" (ILO)
Section 5 "Construction Management Project" (PIC)
Section 6 "Project for the organization of work on the demolition (dismantling) of a linear facility"
Section 7 "Measures for environmental protection" (EP)
Section 8 "Measures to ensure fire safety" (PB)
Section 9 "Construction estimate" (CM)
Section 10 "Other documentation in cases provided for by federal laws"
If any of the sections is not being developed, then this section is still written as part of the project, but we add the inscription "Not being developed" to the note. The numbering of sections does not change.
For example, Section 7 "Project for organizing work on the demolition or dismantling of capital construction facilities" is not always required and we do not develop it, but the numbering of the sections does not change because of this, the next section Section 8 "List of measures for environmental protection" will remain section 8.
A section can contain subsections, for example, as in section 5. In large projects, subsections can also be divided into parts. The parts are divided into books.
2345-IOS4.1.1 - Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 1. Basic decisions.
2345-IOS4.1.2 - Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 2. Automation systems for heating, ventilation and air conditioning
Each section, subsection, part and, if necessary, the book, complete in the volume, as well as each text and graphic document included in the volume, are assigned an independent designation, which is indicated on the cover, title page and / or in the title block, as well as in headers and footers of text documents performed without title blocks.
The section "Other documentation in cases stipulated by federal laws" contains sections that are not included in the main list, but are necessary in the project, for example:
- Industrial Safety Declaration of Hazardous Production Facilities (PB OPO);
- The list of civil defense measures, measures to prevent natural and man-made emergencies (GOChS)
- Technological regulations for waste management
- Security and Protection Deratization System (OZDS)
- Transport safety
- Survey reports
and other sections that are provided for by federal laws or design assignment from the Customer.
All documents are assigned their own code, according to the system in force in the design organization. The cipher includes, for example, the number of the agreement (contract) and / or the code of the construction object (digital, alphabetic or alphanumeric). It is allowed to include other codes used in CAD and EDMS in the basic designation.
If a section is divided into parts, then the designation of the part is made from the designation of the section, to which the part number is added
2345-PZ - Section 1. Explanatory note.
2345-PZU1 - Section 2. Scheme of the planning organization of the land plot. Part 1. General information.
2345-PZU2 - Section 2. Scheme of the planning organization of the land plot. Part 2. Solutions for inland rail transport. If a part is divided into books, then the designation of the book is made up of the designation of the part, to which the book number is added through a dot.
Requirements for design documentation are set out in GOST R 21.1101-2013 SPDS. Basic requirements for design and working documentation
The volumes are completed in the following order:
- cover;
- title page;
- list "Composition of design documentation" (It is allowed not to include the list "Composition of design documentation" in each volume, but complete it with a separate volume);
- text part;
- graphic part (drawings and diagrams).
The number of sheets included in the volume is determined from the need to ensure the convenience of work, as a rule, not more than 300 sheets of A4 format according to GOST 2.301 or an equivalent number of sheets of other formats.
The title page is made in accordance with Form 12 (Appendix H GOST R 21.1101-2013).
The following details are given on the cover:
- field 5 - the name of the capital construction object and, if necessary, the type of construction. The name of the construction object on the cover must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);
- field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation based on the results of engineering surveys" (if any);
- field 10 - year of issue of the document;
- field 11 - for placing the table of registration of changes in form 11 of Appendix M (if necessary).
The title page is performed according to Form 13 (Appendix P GOST R 21.1101-2013).
The following details are given on the title page:
- field 1 - abbreviated, and in its absence - the full name of the parent organization (if any); indicate, as a rule, for government organizations;
- field 2 - logo (optional), full name of the organization that prepared the document;
- field 3 - number and date of issue of the certificate of admission to the relevant types of work (for the preparation of design documentation or for conducting surveys) that affect the safety of the capital construction facility;
- field 4 - short name of the ordering organization (if necessary). The name is indicated in the form: "Customer - name of the customer organization";
- field 5 - the name of the capital construction object and, if necessary, the type of construction. The name of the construction object on the title page must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);
- field 6 - type of documentation (if necessary);
- field 7 - name of the document;
- field 8 - document designation;
- field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation on engineering surveys" (if any);
- field 10 - positions of persons responsible for the development of the document;
- field 11 - signatures of the persons indicated in field 10, performed in accordance with GOST R 6.30. A certifying seal of the organization that prepared the document is also put on this field;
- field 12 - initials and surnames of the persons indicated in field 10;
- field 13 - year of issue of the document;
- field 14 - for placing the table of registration of changes in form 11 of Appendix M (if necessary);
- field 15 - for additional columns of the main inscription in accordance with Appendix G. It is allowed to provide information contained in these columns in a different form in accordance with the requirements established in the organization's standards.
The title can also be in A3 format if the document itself is in this format.
Requirements for the composition and content of sections of project documentation in the course of construction, reconstruction and overhaul of capital construction facilities are determined by law.The main document regulating this is
« Composition and requirements for the content of sections of project documentation in relation to various types of capital construction facilities, including linear facilities, the composition and requirements for the content of sections of design documentation in relation to individual stages of construction, reconstruction of capital construction facilities, composition and requirements for the content of sections of design documentation when carrying out overhaul of capital construction facilities, as well as the composition and requirements for the content of the sections of the design documentation submitted for the state examination of the design documentation and the state construction supervision bodies are established by the Government of the Russian Federation. "()
Working documentation is developed for the implementation of architectural, technical and technological solutions in the construction process.
The regulation does not contain instructions on the sequence of development of working documentation, which determines the possibility of its implementation, both simultaneously with the preparation of project documentation, and after its preparation. Moreover, the volume the composition and content of the working documentation should be determined by the customer (developer) depending on the degree of detail of the solutions contained in the design documentation, and indicated in the design assignment. (see letter dated June 22, 2009 N 19088-SK / 08 Ministry of Regional Development of Russia)
The final set of design and estimate documentation, as a rule, includes design and working documentation ( Approx. This is one of the main differences from the "P" and "RP" design stages, when only the documentation of the "RP" stage is included in the final project.). These types of documentation complement each other:
- The design documentation includes the main sections on the organization of construction ("Explanatory note", "Construction organization project", "Fire safety measures", "Estimates for the construction of capital construction projects", etc.).
- Working documentation contains working drawings, documents, specifications and is the basis for the implementation of the decisions made in the project.
Project documentation
reference
The list of design documentation is usually given in the section "Composition of design documentation" (section code - "SP"). This section is most often found in volume # 0.
If necessary, at the initiative of the customer, design documentation is developed in relation to individual stages of construction, reconstruction of facilities. (cm. ). This is indicated in the design assignment.
Design documentation for individual stages of constructionis developed in the volumes required for the implementation of each stage of construction. It must meet the requirements for the composition and content of sections of design documentation established by the Regulations for capital construction projects.
Reference:
Under construction phase means the construction of one of the capital construction objects, the construction of which is planned to be carried out on one land plot, if such an object can be commissioned and operated autonomously, that is, regardless of the construction of other capital construction objects on this land plot, as well as the construction of part of the capital construction object , which can be put into operation and operated autonomously, that is, regardless of the construction of other parts of this capital construction object.
Let's consider all stages of the project in order:
Stage 1 - PP. Pre-design studies (concept, draft design)
At this stage, the concept of the future facility is being developed, and the main technical and economic characteristics (TEP) are determined. The sketch determines the landing of the object on the ground, its volumetric-spatial solution (ODA), the structural scheme. Also at this stage, the main engineering loads for water, heat and electricity are calculated, the so-called. calculation of loads.
Development of Stages "PP" optional, but helps save time and money in future design.
Stage 2 - PD. Project documentation
Unlike Sketch Design Stage "Project" ("PD" or simply "P") is mandatory and subject to approval by the state executive authorities. Based on the results of the approval of the "Project" Stage, a permit for the construction of the facility is issued. The composition and content of this stage is regulated by the Decree of the Government of the Russian Federation No. 87 dated 16.02.2008. Of course, the composition will be individual for each project, but we will try to compile the most complete list of all possible sections and subsections of the "PD" Stage:
room | Section code | Section title |
Section 1 | Explanatory note | |
Volume 1 | HMO | Explanatory note |
Volume 2 | IRD | Initial permitting documentation |
Section 2 | ROM | Planning organization of the land plot |
Section 3 | AR | Architectural solutions |
Section 4 | Constructive and space-planning solutions | |
Volume 1 | KP1 | Reinforced concrete structures |
Volume 2 | KP2 | Metal constructions |
Volume 3 | KP3 | Wooden structures |
Volume 4 | KR.R | Static calculation |
Section 5 | Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. | |
Subsection 1 | Power supply system | |
Volume 1 | IOS1.1 | External power supply |
Volume 2 | IOS1.2 | Power equipment |
Volume 3 | IOS1.3 | Electric lighting |
Subsection 2 | Water supply system | |
Volume 1 | IOS2.1 | Outdoor water supply |
Volume 2 | IOS2.2 | Domestic water supply |
Subsection 3 | Drainage system | |
Volume 1 | IOS3.1 | External drainage |
Volume 2 | IOS3.2 | Internal drainage |
Subsection 4 | Heating, ventilation and air conditioning, heating networks | |
Volume 1 | IOS4.1 | Heating and ventilation |
Volume 2 | IOS4.2 | Heat supply |
Volume 3 | IOS4.3 | Individual heating point |
Subsection 5 | Communication networks | |
Volume 1 | IOS5.1 | |
Volume 2 | IOS5.2 | |
Volume 3 | IOS5.3 | |
Volume 4 | IOS5.4 | CCTV |
Volume 5 | IOS5.5 | Security alarm |
Volume 6 | IOS5.6 | |
Volume 7 | IOS5.7 | Other low current systems |
Subsection 6 | Gas supply system | |
Volume 1 | IOS6.1 | Outdoor gas supply |
Volume 2 | IOS6.2 | Internal gas supply |
Subsection 7 | Technological solutions | |
Volume 1 | IOS7.1 | Technological solutions |
Volume 2 | IOS7.2 | |
Volume 3 | IOS7.3 | Air supply |
Volume 4 | IOS7.4 | Cold supply |
Volume 5 | IOS7.5 | Steam supply |
Volume 6 | IOS7.6 | Dust extraction |
Volume 7 | IOS7.7 | Other technological systems |
Section 6 | Pic | Construction organization project |
Section 7 | UNDER | Project of organization of works on demolition or dismantling of capital construction objects |
Section 8 | ||
Volume 1 | OOS | List of measures for environmental protection |
Volume 2 | O.S.TR | Draft technological regulations for the management of construction waste at the facility |
Volume 3 | IEI | Engineering and environmental surveys |
Section 9 | ||
Volume 1 | PB1 | Fire safety measures |
Volume 2 | PB2 | |
Volume 3 | PB3 | |
Volume 4 | PB4 | |
Section 10 | ODI | Measures to ensure access for people with disabilities |
Section 10 (1) | ME | Measures to ensure compliance with energy efficiency requirements and requirements for equipment of buildings, structures and structures metering devices for energy resources used |
Section 11 | ||
Volume 1 | CM1 | Estimates for the construction of capital construction projects |
Volume 2 | CM2 | Material price monitoring |
Section 12 | Other documentation in cases stipulated by federal laws | |
Volume 1 | KEO | Lighting calculations of insolation and natural illumination (KEO) |
Volume 2 | ЗШ | Measures to protect against noise and vibration. Assessment of noise impact for the period of operation of the facility |
Volume 3 | ITM GOiChS | Civil defense engineering and technical measures. Emergency prevention measures |
Volume 4 | ED | Building operation manual |
Volume 5 | PTA | Measures to counter terrorist acts |
Volume 6 | DPB | Industrial Safety Declaration of Hazardous Production Facilities |
Stage 3 - RD. Working documentation
Stage "RD" it is necessary primarily for builders, since it most fully and in detail develops design solutions, which were only indicated in the "PD" Stage. Unlike "P", "Work" includes drawings of nodes, axonometric diagrams and profiles of engineering networks, specifications, etc. On the other hand, at the working stage, the documentation loses some sections, the completeness of which was exhausted at the design stage (for example , POS, OOS, KEO, ITM GOiChS, etc.). As in Stage "P", the composition of "RD" will be individual for each project, but we will try to compile the most complete list of all possible sections of the Stage "Working Documentation":
Section code | Section title |
- GP | General plan |
- TR | Transport structures |
- GT | Master plan and transport (when combining GP and TR) |
- HELL | Car roads |
- RV | Railways |
- AR | Architectural solutions |
- AC | Architectural and construction solutions (when combining AR and KR) |
- AI | Interiors |
- KZh | Constructive decisions. Reinforced concrete structures |
- KZh0 | Constructive decisions. Reinforced concrete structures. Foundations |
- KM | Constructive decisions. Metal constructions |
- KMD | Constructive decisions. Metal structures detailing |
- CD | Constructive decisions. Wooden structures |
- CRR | Constructive decisions. Static calculation |
- GR | Hydraulic solutions |
- ES | Power supply system. External power supply |
- EM | Power supply system. Power equipment |
- EO | Power supply system. Electric lighting |
- EN | Power supply system. Outdoor electric lighting |
- EIS | Power supply of engineering systems |
- HB | Water supply system. Outdoor networks |
- NK | Drainage system. Outdoor networks |
- NVK | Water supply and sewerage system. Outdoor networks |
- VK | Water supply and sewerage system. Internal networks |
- HVAC | Heating, ventilation and air conditioning |
- TS | Heat supply |
- TM | Thermal and mechanical solutions (Boiler room, ITP, etc.) |
- RT | Telephony, Radio, TV reception |
- SCS | Structured cabling |
- AIS | Automation of engineering systems |
- ATP | Automation of technological processes |
- AK | Integrated automation (when combining AIS and ATP) |
- VN | CCTV |
- OS | Security alarm |
- ACS | Access control and accounting system |
- GOS | Outdoor gas supply |
- FGP | Internal gas supply |
- TX | Technological solutions |
- TC | Technological communications |
- Sun | Air supply |
- XC | Cold supply |
- PS | Steam supply |
- PU | Dust extraction |
- AUPS - SOUE |
Automatic fire alarm installation, Fire warning and evacuation control system |
- APPZ | Fire protection automation |
- PT | Special fire extinguishing (water, powder, etc.) |
- SD1 | Estimates for the construction of capital construction projects |
- SD2 | Material price monitoring |
- AZ | Anti-corrosion protection |
- TI | Thermal insulation of equipment and pipelines |
GOST R 21.1101-2013 System of design documentation:
4.2. Working documentation
4.2.1. The composition of the working documentation handed over to the customer includes:
- working drawings for construction and installation works;
- attached documents, developed in addition to the working drawings of the main set.
4.2.2. The main sets of working drawings include general data on working drawings, drawings and diagrams provided for by the relevant standards of the System of Design Documentation for Construction (hereinafter - SPDS).
...
4.2.6. The attached documents include:
- working documentation for construction products;
- sketch drawings of general types of non-standard products, performed in accordance with GOST 21.114;
- specification of equipment, products and materials, carried out in accordance with GOST 21.110;
- questionnaires and dimensional drawings carried out in accordance with the data of the equipment manufacturers;
- local estimates by forms;
- other documents stipulated by the relevant SPDS standards.
The specific composition of the attached documents and the need for their implementation are established by the relevant SPDS standards and the design assignment.
...
4.2.8. In working drawings, it is allowed to use standard building structures, products and assemblies by reference to documents containing working drawings of these structures and products. Reference documents include:
- drawings of typical structures, products and assemblies;
- standards, which include drawings intended for the manufacture of products.
Reference documents are not included in the composition of the working documentation handed over to the customer. The design organization, if necessary, transfers them to the customer under a separate contract.
SNiP 11-01-95 Composition of working documentation:
5.1. The composition of the working documentation for the construction of enterprises, buildings and structures is determined by the relevant state SPDS standards and is specified by the customer and the designer in the design agreement (contract).
5.2. State, industry and republican standards, as well as drawings of standard structures, products and assemblies, which are referenced in the working drawings, are not included in the working documentation and can be transferred by the designer to the customer, if it is stipulated in the contract.
Placing an order is carried out by a specialized organization | |
Mailing address | |
Actual address | Russian Federation, 620014, Sverdlovsk region, Yekaterinburg, Malysheva st., 22 |
Telephone | 7-343-3571590 |
Fax | 7-343-3571195 |
[email protected] | |
The contact person | Kostenko Irina Yakovlevna |
Subject of contract
Subject of contract | Development of design estimates for the manufacture of a transport checkpoint. |
Initial (maximum) contract price | RUB 349,980.00 |
Quantity of goods, scope of work or services | Work on the development of design and estimate documentation for the manufacture of a transport checkpoint at the "Customer" facility conv. 1 |
OKDP | |
Place of delivery of goods, performance of work or provision of services | Place of work performed: UBHR PKU "UOUMTS of the Ministry of Internal Affairs of Russia", Yekaterinburg st. Elizavetinskoe highway, 48 A. |
Time for delivery of goods, performance of work or provision of services | Terms (periods) of work performed: within 15 calendar days from the date of conclusion of the State contract. |
Customer | federal state institution "Ural district administration of material and technical supply of the Ministry of Internal Affairs of the Russian Federation" |
Related Documentation
- . development of design and estimate documentation for the manufacture of a transport checkpoint estimate, development of design and estimate documentation for the manufacture of transport checkpoint estimate.rar
- . notice, notice.doc
- . draft state contract, draft state contract.doc
- . Kotir. request, Kotir. application.doc
- More than 730 residents began work in the capital's polyclinics
More than 730 residents have started working in Moscow polyclinics. Anastasia Rakova, Deputy Mayor of Moscow for Social Development, spoke about this on Friday, April 3. Young specialists are receiving appointments in medical institutions, and also make home visits to patients.
- Isolation rules explained in Moscow
Moscow Mayor Sergei Sobyanin said that they will not introduce passes for movement around the city yet, but it all depends on the development of the situation and how the residents of the capital will observe the regime of self-isolation.
Similar lots
- "1.1. The municipal customer instructs, and the Contractor assumes the obligation to carry out the design work, namely: adjusting the design documentation for the object "Modernization of boiler room No. 5 on the street. Communal 8-B / 1 in the city of Ussuriysk ", which has passed the state examination (registration number 25-1-5-0147-11 of 19.10.2011), in accordance with the assignment (Appendix No. 1) within the time frame stipulated by the work schedule (Appendix No. 2) (hereinafter referred to as works). 1.2. The municipal customer accepts the result of the work and pays the contractual price. "
Administration of the Ussuriysk urban district
Department of Urban Development, Utilities and Road Facilities of the Administration of the Municipal Formation "Krasnoyarsk District"
State Treasury Institution "Department of Highways of the Republic of Tyva"
Municipal preschool educational institution "Kindergarten" Firefly "village Rybushka, Saratov district, Saratov region"
Administration of the municipal district Pokhvistnevsky, Samara region
Municipal government institution "Capital construction management of the Okhinsky urban district"
It might be helpful to read:
- Get commercial offers 44 fz;
- Handling complaints is a simple guide that any business can use;
- Justification for a small purchase;
- Fast. Subordinate directories. Quickly 1c enterprise as an owner's guide;
- Business processes Process constructor 1c management;
- Vehicle management 2;
- Retail Automation: Techniques for Retail Automation Equipment;
- How to use the program yat 1s 2;