1c erp pm project organization management. Knowledge management, rationing

To calculate the total cost of implementing the 1C:PM Project Management ERP system, it is necessary to conduct a preliminary survey of the business processes of an automated enterprise and make a number of organizational and administrative decisions to fix or optimize the existing management technology. The cost of licenses for software known immediately.

License cost:

The code Name
4601546116109
1C:PM Project management. Client license for 1 workstation
21,6
4601546116116
1C:PM Project management. Client license for 5 workplaces
74,4
4601546116123
1C:PM Project management. Client license for 10 workstations
144
4601546116130
1C:PM Project management. Client license for 20 seats
240
4601546116147
1C:PM Project management. Client license for 50 seats
480
4601546116154
1C:PM Project management. Client license for 100 seats
720
4601546116161
1C:PM Project management. Client license for 300 seats
1 800

The composition of the products of the "1C: PM Project Management" line

Product "1C:Enterprise 8.PMProject management PROF" (article 4601546122681) includes:

  • Distributions:
    • configuration "PM Project Management PROF";
  • Functional configuration model "PM Project Management PROF";
  • DVD release of ITS;
  • A set of documentation for the configuration "PM Project Management PROF";
  • PIN code for software protection of the configuration "PM Project Management PROF" for one workplace;
  • Licenses for the use of the 1C:Enterprise 8 system and the PM Project Management PROF configuration for one workplace;

Product "1C:Enterprise 8.PMProject Management CORP" (article 4601546122698) includes:

  • Distributions:
    • platforms "1C:Enterprise 8.3";
    • configuration "PM Project Management CORP";
    • configuration "System for designing applied solutions";
  • Functional configuration model "PM Project Management CORP";
  • DVD release of ITS;
  • A set of documentation for the platform "1C:Enterprise 8.3";
  • A set of documentation for the configuration "PM Project Management CORP";
  • A set of documentation for the configuration "System for designing applied solutions";
  • Activation envelope 1C:ITS Industry Preferential;
  • PIN code for the software protection of the 1C:Enterprise 8 platform for one workplace;
  • PIN code for software protection of the "PM Project Management CORP" configuration for one workplace;
  • Licenses for the use of the 1C:Enterprise 8 system and the PM Project Management CORP configuration for one workplace;
  • Pin codes for registration on the user support site.

The expansion of the number of automated workstations is carried out by purchasing client licenses for the 1C:Enterprise 8 platform (for 1, 5, 10, 20, 50, 100, 300, 500, 1000 workstations) and client licenses for "1C:PM Project Management" ( for 1, 5, 10, 20, 50, 100 and 300 jobs). The platform of PROF or CORP versions is provided for "1C:PM Project Management" products, regardless of their versions. 1C:PM Project Management client licenses are intended for licensing workstations that will use the functionality of 1C:PM Project Management products, with the exception of time tracking and project communications management functions.

To use the application solutions of the "1C:PM Project Management" line in the client-server version, you need a license for the "1C:Enterprise 8" server.

Upgrade to the products "1C:PM Project Management PROF" and "1C:PM Project Management CORP" can be performed with software product 4601546036568 "1C: Project office management" by general rules. On the terms of the upgrade, you can purchase the main supplies "1C:PM Project Management PROF" and "1C:PM Project Management CORP". For users of "1C:PM Project Management PROF" an upgrade to "1C:PM Project Management CORP" is provided according to the general rules. For users of "1C:PM Project Management PROF" or "1C:PM Project Management CORP" an upgrade is provided for "1C: ERP + PM Project Management 2" or "Module 1C: PM Project Management for 1C: ERP" according to general rules .

When users of "1C: Project Office Management" switch to the product "1C: PM Project Management PROF" or "1C: PM Project Management CORP", a separate upgrade of client licenses "1C: Project Office Management" to client licenses "1C: PM Project Management". Users can surrender licenses when purchasing, respectively, new licenses under the upgrade scheme.

The cost of the upgrade is calculated according to the formula: the cost of purchased software products minus the cost of the product handed over for upgrade, plus 150 rubles, but not less than half the cost of the purchased set of products.

PM Project Organization Management 2", rev. 2.4 is designed to automate scientific, research, design and survey institutes, engineering companies, design bureaus, IT, management and investment companies, as well as for any other enterprises with a project type of production or using project management in its activities.The product is focused on supporting management activities project-oriented enterprises and organizations.

The main industry-specific functionality of the program:

  • Project management;
  • Planning the scope and timing of the project;
  • Planning of volumes and deliveries of the project;
  • Subcontract planning and material costs project;
  • Planning of personnel and labor costs of the project;
  • Managing workload and working time for projects;
  • Registration of actual data and project events;
  • Project finance management;
  • Dispatching design work;
  • Project update;
  • Project versioning;
  • Plan-fact analysis of the project;
  • Project communications management;
  • Knowledge management, rationing;
  • Project evaluation and contract price calculation;
  • Management of project contracts;
  • Project document management;
  • Project risk management;
  • Project portfolio and program management;
  • Project organization resource management.

The configuration "ERP+PM Management of the project organization 2" is developed on the basis of the typical configuration "ERP Enterprise Management 2", ed. 2.4 software systems "1C: Enterprise 8" with the preservation of all the main features and mechanisms of this standard solution. The configuration is not a stand-alone software product; for its operation, you must have the 1C:Enterprise 8.3 platform installed, version 8.3.11.3133 or later.

The software product is secure and contains code fragments that cannot be changed by the user, and is protected from unauthorized use. At the same time, the principle of maximum openness of the code is implemented to ensure the possibility of adapting the product to the needs of end users.

"1C: ERP + PM Project Organization Management 2" has built-in exchange mechanisms with "1C: Document Management".

2016:1С:ERP+PM Project organization management 2.2

The product is developed on the basis of the configuration "1C: ERP Enterprise Management 2", edition 2.2, is produced jointly with the company "1C".

The product "1C: ERP + PM Project Organization Management 2" is designed to automate scientific, research, design and survey institutes, engineering companies, design bureaus, IT, management and investment companies, as well as for any other enterprises with a design type of production or using management projects in their activities. The product is focused on supporting the management activities of enterprises implementing projects, and is aimed at reducing operating and transaction costs by switching to a new version of the platform and developing functionality.

Functionality of the product "1C: ERP + PM Project Organization Management 2":

Design functionality:

  • Project management
  • Planning the scope and timing of the project
  • Project scope and supply planning
  • Planning subcontracts and material costs of the project
  • Planning of personnel and labor costs of the project
  • Workload and working time management for projects
  • Logging actual data and project events
  • Project finance management
  • Project scheduling
  • Project update
  • Project versioning
  • Plan-fact analysis of the project
  • Project Communications Management
  • Knowledge management, rationing
  • Project evaluation and contract price calculation
  • Project contract management
  • Project document management   ;
  • Project risk management
  • Portfolio and project program management
  • Project organization resource management

ERP functionality:

  • Financial management
  • Budgeting
  • Monitoring and analysis of enterprise performance indicators
  • Regulated accounting
  • Personnel management and billing wages
  • Production Management
  • Cost management and costing
  • Organization of repairs
  • Sales management
  • Customer Relationship Management
  • Purchasing management
  • Warehouse and Inventory Management
  • The possibility of using the internal subsystem for working with files and integration with the "Document Management" and "Enterprise Accounting" configurations has been implemented.

To work with the "1C: ERP + PM Project Management 2" configuration, you must have the "1C: Enterprise 8.3" platform installed.

The software product is protected and contains fragments of code that cannot be changed by the user; it has software protection against unauthorized use. At the same time, the principle of maximum openness of the code is implemented to ensure the possibility of adapting the product to the needs of end users.

The "1C:ERP+PM Project Management 2" configuration was developed using the "1C:Library of Standard Subsystems 8.3" functionality.

2015:1С:ERP+PM Project organization management 2.0

Organizations using software products containing the "ERP Enterprise Management 2.0" configuration will be able to purchase a separate "1C:PM Project Management Module for 1C:ERP Enterprise Management 2.0" and integrate it into a single information system.

In the future, the release of a separate product "Module 1C: PM Project Management for 1C: ERP Enterprise Management 2.0" is planned.

The solution is delivered as a single configuration that includes the "1C: ERP Enterprise Management 2.0" functionality (ERP functionality) and the functionality of the "1C: PM Project Management" project module (Project functionality).

A solution for managing a project-oriented organization, and can be used to:

  • research institutes, design bureaus, research institutes;
  • Machine-building plants, design bureaus;
  • Companies - system integrators, IT, consulting and engineering companies;
  • Mass media and advertising agencies;
  • And any organizations that use in their work such concepts as: "project", "program of projects" and "portfolio of projects".

The 1C:ERP+PM Project Management 2.0 solution automates the following business processes:

Preliminary estimate of the cost of works under the tender (announced competition).

Evaluation of the project and its cost before the start of work.

Run financial assessment using the BDR (income and expense budgets) and BDDS (traffic budgets) methodologies. Money).

Contract management: the solution allows you to establish a link between the project schedule and the contract work plan and fix the initial contractual relationship.

Monitoring the implementation of the KPI of the project and key indicators efficiency.

Distribution of areas of responsibility between different employees working on projects, such as: project team leader, functional manager, project manager, coordinator, etc.

A single information space containing reliable and up-to-date data, project and financial documents, contracts, schedules and other data.

Resource management, analysis of project priorities and allocation of resources between projects.

Deviation response management.

Management of risks. An assessment of the likelihood of impacts that could adversely affect the progress of the project.

Management of work standards.

History of works. The solution allows you to collect and accumulate statistical and historical data and, thus, improve the technology of the enterprise.



Design functionality:

Project management functions include planning the scope, timing, scope and supply of the project, planning labor costs, managing the workload and working hours of specialists, recording data and events for projects, dispatching functions, financial management and version control. There is a plan-fact analysis, knowledge management (knowledge base), communication management, contract evaluation and settlement. For analysts and management, contract management, risk management (risk analysis), project program and project portfolio management, and resource management of the project organization as a whole are provided.


Timing planning:

Includes structural decomposition and placement of milestones or milestones. The project plan, which is a decomposition of deadlines, events, resources, is entered into the system in several ways: through the control panel (manual input), through downloading from templates, or through data exchange with Microsoft Project. You can enter data in a combined way.

Operational planning is carried out in two ways: using the role structure labor resources and matrix management structure or without them. Visualization tools will allow the manager to receive information about the progress of the project in the views convenient for him: Gantt chart, data tree, project milestone maps or in the form of a network diagram.


Work with subcontracts:

The project management program includes functions for planning subcontracts and additional costs for the project. The subcontract plan is entered into the system in the form of amounts, and can be attributed either to the start date of the project, or to the end date, or distributed over the life cycle of the project.

Management of workload, personnel and working hours:

To facilitate planning and management processes, the system uses a role-based workforce structure, and an employee within this structure is a specific individual with a position and a certain level of responsibility. The system will allow you to assign a manager for each task of the project, and for subtasks a manager different from the project manager as a whole can be assigned. The labor force is a set human resources, qualifications, job responsibilities and hardware.

Load management will allow you to analyze the load of labor resources and the feasibility of projects, plan the load and take into account work time for projects and tasks. The project work management program uses a special processing "Analysis of resource conflicts", which will allow timely detection of a possible conflict of labor resources between projects already in progress and approved or planned ones. Processing allows you to distribute the hourly time of each specialist when he participates in different projects.


Milestone Closing:

In the project management program, the volume of work performed, the expended material resources are registered and the various operations to the project. For the fact of the occurrence of a milestone (for example, the completion of a certain amount of work), the system provides the document "Closing the project milestone".

Project finance management:

The project management system allows you to work with the budget of three types: project costs, project income and cash flow using the function of automatic formation of budget elements. The scheme of operation of the auto-formation function is configured by the user of the system, and a situation is allowed when not the entire amount is distributed according to budget items, but only a certain part of it.

The project finance management loop uses an implicit binding of budget items to the project calendar. The calendar period is set in the form of rules and functions that describe the binding of budget items to the time periods of a specific task in the project. When the project deadlines are shifted, the system automatically recalculates financial plans.

The system provides the user with a plan-fact analysis of budgets and an analysis of deviations between the current financial plan and the real state of affairs in the context of tasks, articles, periods, contracts and counterparties.

Visual analysis tools allow you to view and analyze budget data in a user-friendly way (graphs, charts and tables), and within one screen form you can see summary data of any budget and compare income with payments.

Dispatcher:

The project work manager manages the project life cycle, work planning and execution, risk management, and results analysis.

To improve the efficiency of planning and control processes, the system includes a methodology that defines a number of features: the work performed by the workforce is located at the lower level of decomposition (work structure); A job can have only one performer. If it is required to attract several performers, the work must be divided into a number of underlying tasks and operations, or the performers should be combined into one labor resource. This is the cornerstone principle for the work control loop.

The life cycle of a project consists of a number of stages: preliminary planning, operational planning, acceptance for execution, execution of work, report and completion. Project management technologies embedded in the 1C: ERP system allow non-linear progress of work on a project by stages. Tasks can be returned for revision to the executor, or the task can be completed with the sign "not successful" with the transfer of the task or its copy to another executor.

The program implements an escalation mechanism, with the help of which the performer can convey to the manager data on delays in the performance of work. With the help of escalation, “bad news” affects calendar dates and project plans.

Together with the escalation mechanism, the project update circuit works.


Project update mechanism:

Based on the data on the actual implementation or failure of the implementation of design work plans at the lower level of the structural decomposition, the calendar terms of all elements included in the project are recalculated. If other projects depend on the timing of one project, their timing is also recalculated.

Version control mechanism:

This mechanism stores an unlimited number of versions of project plans in the project infobase. The task of the system is to enable the user to maintain several parallel plans for one project. Such simultaneous maintenance may be necessary for the following purposes: the project organization may be able to plan in several sections, for example, in addition to the current plan, have a backup plan, or to track the dynamics of each project and compare the plan with the fact.

Plan-fact analysis:

The company's project management system allows you to do analytics of changes in the project economy, make a plan-fact analysis on earned volumes and labor costs, analyze the use of resources, additional costs, analyze the status of project tasks, analyze deadlines, milestones, indicators and build an S-curve of the project (planned cumulative total).

Knowledge management, rationing:

This circuit allows you to store templates for various projects. A template can be a complete plan or a fragment of any project. The structure of the templates is identical to the structure of projects, information about labor resources, finances, and so on are similar. The difference between a template and a project is that there is no schedule in the template, and therefore the template simply describes some of the methodology used by this enterprise to maintain typical projects.

1C:ERP+PM implements data exchange between the "Project Management" and "Knowledge Management" circuits so that any project plan can be saved as a template. When loading a template into a project plan, the following can happen: the project plan can be replaced, supplemented, or assembled from several templates. When performing such operations, the association between the template and the project is maintained in the database.

At the template level, you can analyze statistics on the use of templates and technologies used in the enterprise in real projects.

Management of project programs and project portfolios:

This contour is necessary for combining projects into programs and portfolios, which can contain projects at different stages of the life cycle. At such levels, the project management system allows you to create a thematic plan for projects, and perform modeling of projects included in the thematic plan for different periods. The system allows you to bring information about project milestones into a single view with the formation of a graphic map. The results of this analysis are used to make decisions. KPI values ​​can be entered manually or automatically calculated by the system.

Resource management:

The system includes three options for the management structure of the company. Matrix structure management, in which projects are managed by project managers, and labor resources are managed by department heads. A functional structure where project plans are managed by department heads who also manage workforce and work execution. And finally design system management, where project managers manage both project plans and resources.

The system has a role structure with two-level planning: at the first stage (preliminary planning of work), the work is distributed by specialists (roles), and then, at the stage operational planning, are distributed among labor resources.

The system normalizes the cost of attracting labor resources for the work performed, while for one labor resource and / or specialist (role) the system can store an unlimited number of accounting rates.

Technologies:

"1C: ERP + PM Project Organization Management 2.0" was created on the basis of the "1C: Enterprise 8.3" platform, which provides high speed performance and system scalability. Full-fledged work with the system via the Internet, in RDP mode or via a web browser, including using mobile devices running Android or iOS. The application interface is fully customizable for a specific user or group of users without programming.

The implementation of "1C: ERP + PM Project Management 2.0" allows you to accelerate the pace and at the same time maintain the quality of project implementation through constant monitoring, identifying deviations and providing management personnel with the necessary data on deviations and problems.

«1C:PM Project management. Module for 1C:ERP" includes all project functionality (PM) of the solution "1C:ERP + PM Project Organization Management 2.0" and pre-configured integration tools with information systems based on "1C: ERP Enterprise Management 2.0". Separate use of the full set of functionality of the product "1C: PM Project Management. Module for 1C:ERP" without integration with solutions containing the "ERP Enterprise Management 2.0" configuration is not provided. Below is a description of the program features for May 2019.

Functionality of the product “1C:PM Project management. Module for 1С:ERP":

  • Project management
  • Project finance management
  • Project versioning
  • Plan-fact analysis of the project
  • Knowledge Management
  • Project risk management

Let us consider in more detail the possibilities of the program by its functional blocks.

Project Management (PM)

  • Workplace project manager
  • Automated functions and areas of project management
  • Certification of projects
  • Project Options
  • Project indicators
  • Statuses (states) of the project
  • Project registration
  • Appointment of a project leader
  • Project plan approval
  • Start of design work
  • Stopping design work
  • Change the project manager
  • Project resumption
  • Project Completion
  • Project Phase Management

The project passport allows you to record and store general information about the project in the system. The project passport displays details that describe the main parameters of the project, such as the current manager, current status, department, project portfolio, project program, and other parameters.

The project life cycle within the system consists of five stages:

  • Project initiation. At this stage, the intention to complete the project is fixed and a project manager is appointed. The project appears in the system as an object.
  • Project planning. At this stage, a preliminary project plan is developed, the scope and timing of design work, the required labor, material and financial resources are determined.
  • Project approval. At this stage, the fundamental feasibility of the project is analyzed, resource conflicts with other projects are identified, adjustments are made and the basic plan project.
  • Project implementation. At this stage, the distribution of work between labor resources is carried out, monitoring and control of the work performed is carried out. Based on the actual data received from the contractors, the project plan is regularly updated. If necessary, operational rescheduling is carried out. Also at this stage, data is collected on the actual costs of material and financial resources.
  • Project Completion. At this stage, the fact of termination of work on the project is recorded, the results achieved are analyzed, deviations are identified and analyzed (in terms of timing, cost, quality, etc.).

Planning the scope and timing of the project

  • Planning the structural decomposition of the project
  • Planning milestones for the project
  • Project schedule calculation
  • Fixing the baseline of the project
  • Import and export of data from / to "MS Project"

Project plan- a set of structural decomposition of work, calendar dates, milestones and data on involved labor, material and financial resources– can be entered into the system in several ways.

  • Manual entry of relevant documents through the project control panel.
  • Loading/unloading project data from/to MS Project.
  • Loading project data from a template stored in the system.

Also, the project plan can be entered into the system in a combined way: part of the data is taken from the template, part is loaded from the MS Project file, part of the data is entered and/or corrected manually.
The system supports two methods of operational planning of design work:

  • Using the role structure of labor resources and the matrix structure of management. In this case, the "project" manager manages the project plan, and the "functional" manager manages the execution of work. The assignment of labor resources to specific work is carried out taking into account the roles performed.
  • Without the use of the role structure of labor resources and the matrix structure of management. In this case, the "project" manager manages both the project plan and the execution of work. The assignment of labor resources to specific jobs is performed without taking into account the roles performed.

The visual toolkit of the system allows the manager to get information about the project in different views: tabular views, data tree, Gantt charts, project milestones map, network diagram.

Project scope and supply planning

Supply planning and project scope planning - input into the system of information about the planned results of the project task. The plan of deliveries and volumes is entered into the system in quantitative and sum values. In this case, the planned results can be attributed either to the start date of the task, or to the end date of the task, or distributed over the period of the task.

Planned results can be included in the planned income budget of the project task with details by department.

Planning subcontracts and material costs of the project

  • Planning for the use of project materials
  • Planning the use of equipment in a project
  • Planning for subcontracts and additional project costs

Planning the use of materials, equipment, subcontracts and additional project costs - entering into the system information about the planned costs necessary to complete the project task. The plan for the use of materials and equipment is entered into the system in quantitative and total values. The plan for the use of subcontracts and additional costs is entered into the system in sums. In this case, the planned costs can be attributed either to the start date of the task, or to the end date of the task, or distributed over the period of the task.

Planned costs can be included in the planned cost budget of the project task with details by department.

Planning of personnel and labor costs of the project

  • Changing the Project Task Manager
  • Assigning work resources to a project
  • Assigning Roles and Scheduling the Work of a Project Task
  • Role assignment and work planning

The system allows you to appoint a manager of a specific project task, and automatically its subtasks, different from the project manager as a whole. A distinctive feature of the system is the role structure of labor resources, which is aimed at facilitating the process of planning, managing and analyzing not only labor resources, but project management generally. An employee within the system is a specific individual holding a certain position in the company.

A labor resource is a unique set of human resources and hardware involved as a performer of those design works that are elementary (not decomposed) within the system. The role of a labor resource is an abstract labor resource that combines qualifications, official duties and place in the functional hierarchy of the enterprise. Workforce roles are used in project plan development, project feasibility analysis, and operational workforce planning.

Assigning labor resources to a project - entering into the system information about which labor resources of the enterprise are supposed to be used to perform work within a particular project. Assigning roles and planning labor costs of a project task - entering into the system information about which roles of labor resources enterprises are supposed to be used to perform work within the framework of a specific design task. In this case, the volume of labor costs and their cost are indicated. The cost of attracting labor resources can be entered either manually or using a previously set normalized cost of using resources.

Assigning specific labor resources and planning the labor costs of a project task - entering into the system information about which particular labor resources of an enterprise are supposed to be used to perform work within a specific project task.

Workload and working time management for projects

  • Analysis of the load of labor resources and the feasibility of the simulated portfolio of projects
  • Planning for operational loading of specialists on projects
  • Time tracking for projects

To analyze the feasibility of a simulated portfolio of projects, the system provides for the processing "Analysis of the loading of resources", which allows you to timely track the conflict in the resources used between the approved, ongoing and planned projects of the enterprise (resource conflict).

To analyze the load of labor resources, the system provides a corresponding report, which is designed to obtain information on the planned load of labor resources in the context of projects, project tasks, elementary operations and periods of time.

To plan the operational load of specialists on projects, the system provides for appropriate processing, which is designed to quickly distribute the hourly time of specialists between the tasks of different projects.

To account for working time for projects, the system provides for the document “Distribution of working time per week”, which is designed to enter into the system data on the distribution of working time spent by the labor resource, during the calendar week, for project and non-project tasks, as well as for entering into the system data on lost (spent unproductive) working time.

Logging actual data and project events

  • Registration of executed volumes
  • Registration of costs of material resources
  • Registration of additional costs
  • Fixing the fact of a control event (passing a milestone)
  • Linking business transactions to a project

For each project task, there are plans for earned value, material costs, and incremental cost plans. During the course of the project, the actual data may differ from the planned ones. The relevant documents are provided in the system for registration of actually completed earned volumes, costs of material resources and additional costs.

To record the fact of a milestone (passing a milestone), the system provides the document "Closing a milestone".

To collect and visualize information about business transactions (represented by primary documents) that were carried out within the framework of a specific project, the system provides for the processing "Project Business Operations".

Project finance management

  • The principle of project budgeting
  • Formation of the budget of income and expenses of the project
  • Formation of the cash flow budget of the project
  • Registration of actual project budgets
  • Plan-fact analysis of project budgets

The system allows you to create, store and update the plans of three project budgets: project cost budget, project income budget, project cash flow budget (receipts and payments). Budget elements are stored in the context of project tasks, budget items, counterparties and contracts (agreements with counterparties).

For the budget of expenses for the project, the system provides for the function of automatic generation of budget elements. The budget of expenses is formed according to information about the costs planned for attracting labor, material and financial resources to the implementation of the project task. Automatic formation is carried out on the basis of the scheme for distributing the amount planned to attract a particular resource, according to cost items. The distribution scheme is configured by the user, and a situation is acceptable when not the entire planned amount, but only some part, is distributed among the budget items.

A key feature of the project finance management loop is the implicit binding of budget elements to calendar periods. When planning budgets, the period is set as a set of rules that describe the linkage of the budget element to the time frame of the project task. When changing the timing of the project task (including when updating the project), the system automatically recalculates financial plans.

Entering data on actual receipts and payments, as well as on the accrual of actual income and expenses can be made at any stage life cycle project, and even after the completion of the project.

At the level of project budgets, the system allows you to:

  • Plan-fact analysis of the budget of income, expenses and cash flows for the project in the context of project tasks, budget items, contractors, contracts and calendar periods.
  • Analysis of deviations between current data financial plan, any version of the financial plan and the actual state of affairs, identifying deviations.

The visual toolkit of the system allows the user to obtain project budget data, both in tabular and graphical representation (diagrams and graphs). Within one screen form, you can get a detailed and consolidated plan of any of the budgets, comparison of income with expenses and receipts with payments, comparison of planned and actual data, etc.

Project scheduling

  • Project Task Life Cycle
  • Planning and execution of works
  • Project timing risk management
  • Analysis of work results

The methodology embedded in the system defines a number of features for design work that increase the efficiency of planning and control processes. Namely:

  • The specific work that a workforce performs on a project should be at the lowest level of the work breakdown structure.
  • This work can have one and only one artist. In the event that the performance of work requires the involvement of several performers, it is necessary either to decompose the work into a number of elementary operations, or to combine the performers into one labor resource. The principle of "one job - one performer" is the cornerstone of the work management circuit.

The life cycle of project work consists of the following stages:

  • Advance planning. At this stage, an elementary operation appears in the project plan, the contractor, duration, labor intensity and cost of the work are indicated. The role of the labor resource appears as an executor at this stage.
  • operational planning. At this stage, the performer of the work is determined, the exact terms are determined. The labor resource appears as a performer at this stage.
  • Acceptance for execution. At this stage, the performer receives information about the task assigned to him and confirms his participation in its implementation.
  • Performance. At this stage, periodic input into the system of data on the working time spent on the task is performed.
  • Performance report. At this stage, the performer reports on the performance of the work, indicates the actual time and his actual labor costs.
  • Completion. At this stage, the manager confirms the completion of the work, if necessary, adjusts the actual time and labor costs.

A non-linear progression of the project work through the stages is allowed: the task can be returned to the executor for revision, the task can be completed with the “unsuccessful” sign (in this case, a new instance of the task is created and transferred to another executor), etc.

The mechanism of project work escalation implemented in the system allows the contractor to convey to the management, data on the expected delays in the execution of work. This data is used by the updating mechanism - "bad news" affects the project's calendar dates upon their registration in the system.

At the level of design work, the system allows you to:

  • Collection and subsequent analysis of data on the distribution of the working time of performers between project and non-project tasks, as well as data on unproductive costs (losses) of working time.
  • Analysis of the accumulated statistical information on the performance of work, plan-fact analysis of the duration, labor intensity and cost of the work, identification and analysis of deviations that have arisen.
  • Analysis of the accumulated statistical information on the escalation of design work, identification and analysis of the causes of failure to meet deadlines, analysis of the consequences of such failures.

The visual toolkit of the system allows the user to receive information in a convenient form about the work in which he is either a performer or a leader. The task list view actively uses color and graphic coding, it is possible to display the list of tasks in the form of a Gantt chart.

Project update

  • Updating the project timeline
  • Updating % of project readiness

The key mechanism of the project management loop is the project update mechanism: based on the data on the actual implementation (or failure to complete) the design work of the lower level of decomposition, the system performs a complete recalculation of the calendar terms of all project elements. Updating the project, which is carried out regularly, allows the manager to receive reliable information about the status of work and promptly respond to emerging problems.

Project versioning

The system allows you to create and store an unlimited number of project plan versions in the infobase. The main task of the versioning subsystem is to enable users of the system to maintain several plans in parallel for one project. Simultaneous maintenance of several plans is necessary for the following purposes:

  • Be able to plan in multiple perspectives (e.g. baseline, approved plan, current plan)
  • To be able to track the history of changes (dynamics) of each section and compare it with the fact.

Plan-fact analysis of the project

  • Project S-curve
  • Analysis of the dynamics of the project economy
  • Plan-fact analysis of earned value
  • Analysis of earned value by labor costs
  • Plan-fact analysis of labor costs
  • Plan-fact analysis of resource use
  • Plan-fact analysis of the cost of material resources
  • Plan-fact analysis of additional costs
  • Analysis of the state of design tasks
  • Plan-fact analysis of project timing
  • Plan-fact analysis of project milestones
  • Project analysis by indicators

At the project level, the system allows you to analyze the dynamics of the project economy, plan-to-fact analysis of earned volumes, analysis of earned value by labor costs, plan-to-fact analysis of labor costs, plan-to-fact analysis of resource use, plan-to-fact analysis of material resources costs, plan-to-fact analysis of additional costs, analysis of the state of project tasks, plan-fact analysis of project timing, plan-fact analysis of milestones (milestones) of the project, analysis of the project by indicators, and also build the S-curve of the project.

Project Communications Management

The system allows you to create and store project tasks in the infobase. Project assignments are intended for input and accounting internal works project office. Tasks can be tied to a project or project task or be a stand-alone unit.

The system provides a mechanism for commenting tasks and a mechanism for managing task statuses.

Knowledge management, rationing

  • Project typification
  • Library of design work templates
  • Rationing of design work
  • Create a project from a template
  • Saving a project to a template
  • Comparative analysis template projects
  • Update Project Work Rates in Template
  • Fixing design decisions

The system allows creating and storing project templates in the infobase. A template can be either a complete project plan or any of the fragments of a project plan. The data structure of the template is almost completely identical to the structure of the project: structural decomposition of work, information about labor, material and financial resources, budgets. The main difference between a template and a project plan is that there are no calendar deadlines in the template. Essentially, a project template describes the technology used by an enterprise to carry out typical projects.

The system implements the possibility of data exchange between project management and knowledge management loops. Any project plan can be saved as a template. Any of the templates can be loaded into the project plan, while the project plan can be replaced or supplemented with template data - the project plan can be assembled from several templates. When performing any data exchange operations between the knowledge management and project management loops, the link between the template element and the corresponding project element is stored in the infobase.

At the project template level, the system allows you to:

  • Analysis of statistical information on the use of technologies adopted at the enterprise in real projects.
  • Analysis of deviations (in terms of duration, labor intensity, cost of design work) arising in standard projects. The results of the analysis are used to identify "bottlenecks" and "best practices", and are also used to make decisions on improving project implementation technologies.

Project evaluation and contract price calculation

  • Project evaluation
  • Contract price calculation
  • Formation of a project plan according to a template and an estimate

The system provides a document that allows, based on the information on the number of man-hours by role required for the implementation of the contract, and the amount of other costs, to generate a report reflecting the planned cost of the contract, possible profit and profitability, to calculate the planned cost of the contract at a given percentage of profitability.

Based on the document "Calculation of the contract price" and the project template, the system allows you to create a project plan.

Project contract management

  • Drawing up a project contract
  • Relationship between project and contract stages
  • Registration of amendments to the project agreement additional agreements
  • Formation of BDDS and BDR according to the stages of the project agreement
  • Formation printed form template agreements

The system allows you to detail the composition of the contract of counterparties to the activated stages, specify the terms of payment under the contract and establish a link between the contract and the stages of the project.

Information about the terms of payment under the contract is used in the formation of the cash flow budget for the stages of the project.

Project Document Management

Options for working with documents:

  • Storage of documents in the infobase
  • Storing documents in "1C: Document Management"

The system allows you to use an internal subsystem for working with files or an external one - "1C: Document Management".

The main actions with documents - opening, capturing for editing, writing a new version) are available directly from the system.

For certain types of objects (projects, project tasks, etc.), the system allows you to create, store, and modify links to documents located in the 1C:Document Management repository.

Project risk management

  • Project Risk Identification
  • Project risk assessment
  • Planning activities to work with risks
  • Fixing the fulfillment of risks
  • Project risk management monitoring

A subsystem is being developed that will allow identifying project risks, assessing project risks, planning risk management activities, recording risk accomplishments, and monitoring project risk management.

Portfolio and project program management

  • Project portfolios
  • Project programs
  • Workplace of the head of the project office
  • Drawing up a thematic plan for projects
  • Analysis of project indicators
  • Analysis of projects by milestones
  • Plan-factual reporting on portfolios and project programs

The system allows you to combine projects into programs and portfolios. One portfolio and/or one program of projects may contain projects at different stages of the life cycle. The portfolio of projects and the program of projects are additional analytical sections for all reports and analytical tools of the system, in which projects appear in one capacity or another.

At the project portfolio level, the system allows you to:

  • Drawing up a thematic plan for projects. Modeling the composition of projects included in the thematic plan, with various indicators for planning periods;
  • Analysis of project portfolio milestones. Summarize information about milestones across projects in one view. Formation of a graphic map of design milestones. In the event of an actual or potential failure to meet deadlines, the projected financial sanctions are calculated. The results of the analysis are used to make decisions in the process of operational and financial control of the enterprise;
  • Analysis of the current state and dynamics of changes in key indicators of projects included in the portfolio or program. The values ​​of key indicators can be entered manually by project managers, or they can be automatically calculated by the system, if the initial data for calculation can be obtained from the information base.

Project organization resource management

  • The structure of the labor resources of the enterprise
  • Workforce capacity planning
  • Material resources of the enterprise
  • Rationing the cost of resources

The system supports three options for the management structure of an enterprise:

  • Project management structure. Project plans, workforce, and work execution are managed by project and project task managers.
  • Functional management structure. Project plans, human resources and work execution are managed by heads of divisions and departments.
  • Matrix control structure. Project managers manage project plans, department heads manage work resources and work execution.

The system uses the role structure of labor resources and two-level planning of project work: at the stage of preliminary planning, work is planned by roles (specialties), then at the stage of operational planning, work is distributed among labor resources.

The system allows you to normalize the cost of attracting labor resources to perform work; for one labor resource and / or role, any number of discount rates can be stored in the system.

At the level of a pool of labor resources, the system allows you to produce:

  • Modeling the resource constraints of the enterprise by entering the planned capacity for each of the roles (specialties) into the system. Comparison of the planned and actual capacity of the roles of labor resources, identification of "bottlenecks".
  • Analysis of the planned and actual loading of resources, identification of "overloaded" and "underloaded" labor resources.
  • Service options
  • Checking the project structure
  • Search for problematic objects of the IS Subsystem

Technological advantages

"1C:PM Project Management for 1C:ERP" was developed on latest version technological platform "1C:Enterprise 8.3", which allows:

  • ensure high reliability, performance and scalability of the system;
  • organize work with the system via the Internet, in the mode thin client or a web client (via a regular Internet browser), including in the "cloud" mode;
  • create mobile workplaces using tablets and smartphones running iOS or Android;
  • customize the interface for a specific user or user group, taking into account the user's role, access rights and individual settings.

The functional options mechanism implemented in 1C:PM Project Management for 1C:ERP allows you to “turn on” or “turn off” various functional parts applied solution without programming (configuration changes).

Solution "1С:ERP+PM Project Organization Management 2.0" - a joint product of the company ITLand and firms "1C", the development of which took into account the methodologies of the world's leading standards for managing projects and project portfolios, as well as the experience of automating Russian project-oriented enterprises.

The solution is a development of the software product "1C: Project Organization Management". When developing Special attention was given to the implementation of the functionality demanded large enterprises various directions activities. This approach made it possible to significantly expand the capabilities and scope of the new ERP solution compared to "1C: Project Organization Management" version 1.3.

The solution is designed for:

  • Research, design, research institutes
  • Machine-building enterprises, design bureaus
  • Engineering, IT and consulting companies, system integrators
  • project media business (organization of exhibition activities, media, advertising agencies)
  • Any other organizations that use in their work the concepts: "project", "portfolio of projects" and "program of projects"

Core business processes, automated using "1C: ERP + PM Project Organization Management 2.0":

  • Estimating the cost of the project before the start of work. Preliminary estimate of the cost of works under the announced competition (tender).
  • Organization effective management company finances using project budgeting technology, using BDDS (cash flow budgets) and BDR (income and expense budgets).
  • . Fixing the terms of the initial contractual relationship, fixing changes and additional agreements. Establishing links between the work schedule under the contract and the project work schedule. Creation of income and expense budgets and a cash flow budget for the project based on the terms of the contract.
  • Project monitoring by key performance indicators. Providing operational data on key indicators to achieve strategic and tactical (operational) goals.
  • Ensuring effective management of the company with various organizational structures(functional, design, matrix structures). Separation of areas of responsibility between project managers, project team leaders and functional managers in the planning of work and control over their execution.
  • Ensuring communications and effective interaction between the design and functional services of the organization.
  • Prompt provision of the company's management personnel with up-to-date and reliable information through access to a single information space, to design, financial, primary documents and data.
  • Efficient Distribution resources between projects. Objective analysis project priorities and assessment of the degree of impact of deviations on the implementation of design work.
  • Increasing the pace and quality of project implementation. Continuous monitoring of project progress, identifying deviations at the earliest stages of the project. Providing the company's management personnel with the necessary information about emerging problems and violations of plans.
  • Timely response to deviations arising in the course of design work.
  • Management of risks. Increasing the likelihood of occurrence and impact of favorable events and reducing the likelihood of occurrence and impact of adverse events for the project.
  • Collection and analysis of the history of work on projects, improvement of enterprise technologies. Accumulation and analysis of historical and statistical data, selection of "Best practices". Fixing design decisions for the possibility of their use on subsequent projects. Definition of standards for each type of design work.

Project functional (PM):

  • Project management
  • Project finance management
  • Project versioning
  • Plan-fact analysis of the project
  • Knowledge Management
  • Project contract management
  • Project risk management
  • Project organization resource management

ERP functionality:

  • Production Management
  • Cost management and costing
  • Financial management
  • Budgeting
  • Monitoring and analysis of enterprise performance indicators
  • Regulated accounting
  • Human Resources and Payroll
  • Sales management
  • Customer Relationship Management
  • Purchasing management
  • Warehouse and Inventory Management
  • Organization of repairs

The solution works in managed application mode. Implemented integration with the "1C: Document Management" system.

Opportunities

Project Management (PM)

  • Workplace of the project manager
  • Automated functions and areas of project management
  • Certification of projects
  • Project Options
  • Project indicators
  • Statuses (states) of the project
  • Project registration
  • Appointment of a project leader
  • Project plan approval
  • Start of design work
  • Stopping design work
  • Change the project manager
  • Project resumption
  • Project Completion
  • Project Phase Management

The project passport allows you to record and store general information about the project in the system. The project passport displays details that describe the main parameters of the project, such as the current manager, current status, department, project portfolio, project program, and other parameters.

The project life cycle within the system consists of five stages:

  • Project initiation. At this stage, the intention to complete the project is fixed and a project manager is appointed. The project appears in the system as an object.
  • Project planning. At this stage, a preliminary project plan is developed, the scope and timing of design work, the required labor, material and financial resources are determined.
  • Project approval. At this stage, the fundamental feasibility of the project is analyzed, resource conflicts with other projects are identified, adjustments are made, and the basic project plan is approved.
  • Project implementation. At this stage, the distribution of work between labor resources is carried out, monitoring and control of the work performed is carried out. Based on the actual data received from the contractors, the project plan is regularly updated. If necessary, operational rescheduling is carried out. Also at this stage, data is collected on the actual costs of material and financial resources.
  • Project Completion. At this stage, the fact of termination of work on the project is recorded, the results achieved are analyzed, deviations are identified and analyzed (in terms of timing, cost, quality, etc.).

Planning the scope and timing of the project

  • Planning the structural decomposition of the project
  • Planning milestones for the project
  • Project schedule calculation
  • Fixing the baseline of the project
  • Import and export of data from/to "MS Project"

Project plan- a set of structural decomposition of work, calendar dates, control events and data on attracted labor, material and financial resources - can be entered into the system in several ways.

  • Manual entry of relevant documents through the project control panel.
  • Loading/unloading project data from/to MS Project.
  • Loading project data from a template stored in the system.

Also, the project plan can be entered into the system in a combined way: part of the data is taken from the template, part is loaded from the MS Project file, part of the data is entered and/or corrected manually.
The system supports two methods of operational planning of design work:

  • Using the role structure of labor resources and the matrix structure of management. In this case, the "project" manager manages the project plan, and the "functional" manager manages the execution of the work. The assignment of labor resources to specific work is carried out taking into account the roles performed.
  • Without the use of the role structure of labor resources and the matrix structure of management. In this case, the "project" manager manages both the project plan and the execution of the work. The assignment of labor resources to specific jobs is performed without taking into account the roles performed.

The visual toolkit of the system allows the manager to get information about the project in different views: tabular views, data tree, Gantt charts, project milestones map, network diagram.

Project scope and supply planning

  • Project Supply Planning
  • Project scope planning

Supply planning and project scope planning - input into the system of information about the planned results of the project task. The plan of deliveries and volumes is entered into the system in quantitative and sum values. In this case, the planned results can be attributed either to the start date of the task, or to the end date of the task, or distributed over the period of the task.

Planned results can be included in the planned income budget of the project task with details by department.

Planning subcontracts and material costs of the project

  • Planning for the use of project materials
  • Planning the use of equipment in a project
  • Planning for subcontracts and additional project costs

Planning the use of materials, equipment, subcontracts and additional project costs - entering into the system information about the planned costs necessary to complete the project task. The plan for the use of materials and equipment is entered into the system in quantitative and total values. The plan for the use of subcontracts and additional costs is entered into the system in sums. In this case, the planned costs can be attributed either to the start date of the task, or to the end date of the task, or distributed over the period of the task.

Planned costs can be included in the planned cost budget of the project task with details by department.

Planning of personnel and labor costs of the project

  • Changing the Project Task Manager
  • Assigning work resources to a project
  • Assigning Roles and Scheduling the Work of a Project Task
  • Role assignment and work planning

The system allows you to appoint a manager of a specific project task, and automatically its subtasks, different from the project manager as a whole. A distinctive feature of the system is the role structure of labor resources, which is aimed at facilitating the process of planning, managing and analyzing not only labor resources, but also project management in general . An employee within the system is a specific individual holding a certain position in the enterprise.

The labor resource is a unique set of human resources and hardware involved as a performer of those design works that are elementary within the system (not decomposed). The role of the labor resource is an abstract labor resource that combines qualifications, job responsibilities and place in the functional hierarchy of the enterprise. Workforce roles are used in project plan development, project feasibility analysis, and operational workforce planning.

Assigning labor resources to a project - entering into the system information about which labor resources of the enterprise are supposed to be used to perform work within the framework of a particular project. Assigning roles and planning labor costs of a project task - entering into the system information about which roles of labor resources enterprises are supposed to be used to perform work within the framework of a specific design task. In this case, the volume of labor costs and their cost are indicated. The cost of attracting labor resources can be entered either manually or using a previously set normalized cost of using resources.

Assignment of specific labor resources and planning of labor costs of a project task - entering into the system information about which specific labor resources of an enterprise are supposed to be used to perform work within a specific project task.

Workload and working time management for projects

  • Analysis of the load of labor resources and the feasibility of the simulated portfolio of projects
  • Planning for operational loading of specialists on projects
  • Time tracking for projects

To analyze the feasibility of a simulated portfolio of projects, the system provides for the processing "Analysis of the load of resources", which allows you to timely track the conflict in the resources used between the approved, ongoing and planned projects of the enterprise (resource conflict).

To analyze the load of labor resources, the system provides a corresponding report, which is designed to obtain information on the planned load of labor resources in the context of projects, project tasks, elementary operations and periods of time.

To plan the operational load of specialists on projects, the system provides for appropriate processing, which is designed to quickly distribute the hourly time of specialists between the tasks of different projects.

To record working time for projects, the system provides a document "Distribution of working time per week", which is designed to enter into the system data on the distribution of working time spent by the labor resource, during the calendar week, for project and non-project tasks, as well as for entering into the system data on lost (spent unproductive) working time.

Logging actual data and project events

  • Registration of executed volumes
  • Registration of costs of material resources
  • Registration of additional costs
  • Fixing the fact of a control event (passing a milestone)
  • Linking business transactions to a project

For each project task, there are plans for earned value, material costs, and incremental cost plans. During the course of the project, the actual data may differ from the planned ones. The relevant documents are provided in the system for registration of actually completed earned volumes, costs of material resources and additional costs.

To record the fact of a milestone (passing a milestone), the system provides the document "Closing a milestone".

To collect and visualize information about business transactions (represented by primary documents) that were carried out within the framework of a specific project, the system provides for the processing of "Business transactions of the project".

Project finance management

  • The principle of project budgeting
  • Formation of the budget of income and expenses of the project
  • Formation of the cash flow budget of the project
  • Registration of actual project budgets
  • Plan-fact analysis of project budgets

The system allows you to create, store and update the plans of three project budgets: project cost budget, project income budget, project cash flow budget (receipts and payments). Budget elements are stored in the context of project tasks, budget items, counterparties and contracts (agreements with counterparties).

For the budget of expenses for the project, the system provides for the function of automatic generation of budget elements. The budget of expenses is formed according to information about the costs planned for attracting labor, material and financial resources to the implementation of the project task. Automatic formation is carried out on the basis of the scheme for distributing the amount planned to attract a particular resource, according to cost items. The distribution scheme is configured by the user, and a situation is acceptable when not the entire planned amount, but only some part, is distributed among the budget items.

A key feature of the project finance management loop is the implicit binding of budget elements to calendar periods. When planning budgets, the period is set as a set of rules that describe the linkage of the budget element to the time frame of the project task. When changing the timing of the project task (including when updating the project), the system automatically recalculates financial plans.

Data entry on actual receipts and payments, as well as on the accrual of actual income and expenses, can be made at any stage of the project life cycle, and even after the completion of the project.

At the level of project budgets, the system allows you to:

  • Plan-fact analysis of the budget of income, expenses and cash flows for the project in the context of project tasks, budget items, contractors, contracts and calendar periods.
  • Analysis of deviations between the data of the current financial plan, any version of the financial plan and the actual state of affairs, identification of deviations.

The visual toolkit of the system allows the user to obtain project budget data, both in tabular and graphical representation (diagrams and graphs). Within one screen form, you can get a detailed and consolidated plan of any of the budgets, comparison of income with expenses and receipts with payments, comparison of planned and actual data, etc.

Project scheduling

  • Project Task Life Cycle
  • Planning and execution of works
  • Project timing risk management
  • Analysis of work results

The methodology embedded in the system defines a number of features for design work that increase the efficiency of planning and control processes. Namely:

  • The specific work that a workforce performs on a project should be at the lowest level of the work breakdown structure.
  • This work can have one and only one artist. In the event that the performance of work requires the involvement of several performers, it is necessary either to decompose the work into a number of elementary operations, or to combine the performers into one labor resource. The principle of "one job - one performer" is the cornerstone of the work management circuit.

The life cycle of project work consists of the following stages:

  • Advance planning. At this stage, an elementary operation appears in the project plan, the contractor, duration, labor intensity and cost of the work are indicated. The role of the labor resource appears as an executor at this stage.
  • operational planning. At this stage, the performer of the work is determined, the exact terms are determined. The labor resource appears as a performer at this stage.
  • Acceptance for execution. At this stage, the performer receives information about the task assigned to him and confirms his participation in its implementation.
  • Performance. At this stage, periodic input into the system of data on the working time spent on the task is performed.
  • Performance report. At this stage, the performer reports on the performance of the work, indicates the actual time and his actual labor costs.
  • Completion. At this stage, the manager confirms the completion of the work, if necessary, adjusts the actual time and labor costs.

A non-linear progression of the project work through the stages is allowed: the task can be returned to the executor for revision, the task can be completed with the "unsuccessful" sign (in this case, a new instance of the task is created and transferred to another executor), etc.

The mechanism of project work escalation implemented in the system allows the contractor to convey to the management, data on the expected delays in the execution of work. This data is used by the updating mechanism - "bad news" affects the project's calendar dates upon their registration in the system.

At the level of design work, the system allows you to:

  • Collection and subsequent analysis of data on the distribution of the working time of performers between project and non-project tasks, as well as data on unproductive costs (losses) of working time.
  • Analysis of the accumulated statistical information on the performance of work, plan-fact analysis of the duration, labor intensity and cost of the work, identification and analysis of deviations that have arisen.
  • Analysis of the accumulated statistical information on the escalation of design work, identification and analysis of the causes of failure to meet deadlines, analysis of the consequences of such failures.

The visual toolkit of the system allows the user to receive information in a convenient form about the work in which he is either a performer or a leader. The task list view actively uses color and graphic coding, it is possible to display the list of tasks in the form of a Gantt chart.

Project update

  • Updating the project timeline
  • Updating % of project readiness

The key mechanism of the project management loop is the project update mechanism: based on the data on the actual implementation (or failure to complete) the design work of the lower level of decomposition, the system performs a complete recalculation of the calendar terms of all project elements. Updating the project, which is carried out regularly, allows the manager to receive reliable information about the status of work and promptly respond to emerging problems.

Project versioning

The system allows you to create and store an unlimited number of project plan versions in the infobase. The main task of the versioning subsystem is to enable users of the system to maintain several plans in parallel for one project. Simultaneous maintenance of several plans is necessary for the following purposes:

  • Be able to plan in multiple perspectives (e.g. baseline, approved plan, current plan)
  • To be able to track the history of changes (dynamics) of each section and compare it with the fact.

Plan-fact analysis of the project

  • Project S-curve
  • Analysis of the dynamics of the project economy
  • Plan-fact analysis of earned value
  • Analysis of earned value by labor costs
  • Plan-fact analysis of labor costs
  • Plan-fact analysis of resource use
  • Plan-fact analysis of the cost of material resources
  • Plan-fact analysis of additional costs
  • Analysis of the state of design tasks
  • Plan-fact analysis of project timing
  • Plan-fact analysis of project milestones
  • Project analysis by indicators

At the project level, the system allows you to analyze the dynamics of the project economy, plan-to-fact analysis of earned volumes, analysis of earned value by labor costs, plan-to-fact analysis of labor costs, plan-to-fact analysis of resource use, plan-to-fact analysis of material resources costs, plan-to-fact analysis of additional costs, analysis of the state of project tasks, plan-fact analysis of project timing, plan-fact analysis of milestones (milestones) of the project, analysis of the project by indicators, and also build the S-curve of the project.

Project Communications Management

The system allows you to create and store project tasks in the infobase. Project tasks are designed to enter and record the internal work of the project office. Tasks can be tied to a project or project task or be a stand-alone unit.

The system provides a mechanism for commenting tasks and a mechanism for managing task statuses.

Knowledge management, rationing

  • Project typification
  • Library of design work templates
  • Rationing of design work
  • Create a project from a template
  • Saving a project to a template
  • Comparative analysis of projects by templates
  • Update Project Work Rates in Template
  • Fixing design decisions

The system allows creating and storing project templates in the infobase. A template can be either a complete project plan or any of the fragments of a project plan. The data structure of the template is almost completely identical to the structure of the project: structural decomposition of work, information about labor, material and financial resources, budgets. The main difference between a template and a project plan is that there are no calendar deadlines in the template. Essentially, a project template describes the technology used by an enterprise to carry out typical projects.

The system implements the possibility of data exchange between project management and knowledge management loops. Any project plan can be saved as a template. Any of the templates can be loaded into the project plan, while the project plan can be replaced, or supplemented with template data - the project plan can be assembled from several templates. When performing any data exchange operations between the knowledge management and project management loops, the link between the template element and the corresponding project element is stored in the infobase.

At the project template level, the system allows you to:

  • Analysis of statistical information on the use of technologies adopted at the enterprise in real projects.
  • Analysis of deviations (in terms of duration, labor intensity, cost of design work) arising in standard projects. The results of the analysis are used to identify "bottlenecks" and "best practices", and are also used to make decisions on improving project implementation technologies.

Project evaluation and contract price calculation

  • Project evaluation
  • Contract price calculation
  • Formation of a project plan according to a template and an estimate

The system provides a document that allows, based on the information on the number of man-hours by role required for the implementation of the contract, and the amount of other costs, to generate a report reflecting the planned cost of the contract, possible profit and profitability, to calculate the planned cost of the contract at a given percentage of profitability.

Based on the document "Contract price calculation" and the project template, the system allows you to generate a project plan.

Project contract management

  • Drawing up a project contract
  • Relationship between project and contract stages
  • Registration of amendments to the project agreement by additional agreements
  • Formation of BDDS and BDR according to the stages of the project agreement
  • Formation of a printed form of the contract according to the template

The system allows you to detail the composition of the contract of counterparties to the activated stages, specify the terms of payment under the contract and establish a link between the contract and the stages of the project.

Information about the terms of payment under the contract is used in the formation of the cash flow budget for the stages of the project.

Project Document Management

Options for working with documents:

  • Storage of documents in the infobase
  • Storing documents in "1C: Document Management"

The system allows you to use an internal subsystem for working with files or an external one - "1C: Document Management".

The main actions with documents - opening, capturing for editing, writing a new version) are available directly from the system.

For certain types of objects (projects, design tasks, etc.), the system allows you to create, store, and modify links to documents located in the "1C: Document Management" storage.

Project risk management

  • Project Risk Identification
  • Project risk assessment
  • Planning activities to work with risks
  • Fixing the fulfillment of risks
  • Project risk management monitoring

A subsystem is being developed that will allow identifying project risks, assessing project risks, planning risk management activities, recording risk accomplishments, and monitoring project risk management.

Portfolio and project program management

  • Project portfolios
  • Project programs
  • Workplace of the head of the project office
  • Drawing up a thematic plan for projects
  • Analysis of project indicators
  • Analysis of projects by milestones
  • Plan-factual reporting on portfolios and project programs

The system allows you to combine projects into programs and portfolios. One portfolio and/or one program of projects may contain projects at different stages of the life cycle. The portfolio of projects and the program of projects are additional analytical sections for all reports and analytical tools of the system, in which projects appear in one capacity or another.

At the project portfolio level, the system allows you to:

  • Drawing up a thematic plan for projects. Modeling the composition of projects included in the thematic plan, with various indicators for planning periods;
  • Analysis of project portfolio milestones. Summarize information about milestones across projects in one view. Formation of a graphic map of design milestones. In the event of an actual or potential failure to meet deadlines, the projected financial sanctions are calculated. The results of the analysis are used to make decisions in the process of operational and financial control of the enterprise;
  • Analysis of the current state and dynamics of changes in key indicators of projects included in the portfolio or program. The values ​​of key indicators can be entered manually by project managers, or they can be automatically calculated by the system, if the initial data for calculation can be obtained from the information base.

Project organization resource management

  • The structure of the labor resources of the enterprise
  • Workforce capacity planning
  • Material resources of the enterprise
  • Rationing the cost of resources

The system supports three options for the management structure of an enterprise:

  • Project management structure. Project plans, workforce, and work execution are managed by project and project task managers.
  • Functional management structure. Project plans, human resources and work execution are managed by heads of divisions and departments.
  • Matrix control structure. Project managers manage project plans, department heads manage work resources and work execution.

The system uses the role structure of labor resources and two-level planning of project work: at the stage of preliminary planning, work is planned by roles (specialties), then at the stage of operational planning, work is distributed among labor resources.

The system allows you to normalize the cost of attracting labor resources to perform work; for one labor resource and / or role, any number of discount rates can be stored in the system.

At the level of a pool of labor resources, the system allows you to produce:

  • Modeling the resource constraints of the enterprise by entering the planned capacity for each of the roles (specialties) into the system. Comparison of planned and actual capacity of the roles of labor resources, identification of "bottlenecks".
  • Analysis of the planned and actual loading of resources, identification of "overloaded" and "underloaded" labor resources.
  • Service options
  • Checking the project structure
  • Search for problematic objects of the IS Subsystem

Technological advantages

"1C:ERP+PM Project Organization Management 2.0" was developed on the latest version of the technological platform "1C:Enterprise 8.3", which allows:

  • ensure high reliability, performance and scalability of the system;
  • organize work with the system via the Internet, in the thin client or web client mode (via a regular Internet browser), including in the "cloud" mode;
  • create mobile workplaces using tablets and smartphones running iOS or Android;
  • customize the interface for a specific user or user group, taking into account the user's role, access rights and individual settings.

Functional options mechanism implemented in "1C:ERP+PM Project Organization Management 2.0" allows you to "turn on" or "turn off" various functional parts of the applied solution without programming (configuration changes).

 

It might be useful to read: