Contract for partial car wrapping with decorative film. Business on covering a car with vinyl wrap. Features of the choice of premises

So we paste over taxi cars in accordance with GOST. This applies to those who received a taxi license for the Moscow region after February 10, 2017.


We cover cars according to GOST. It means that MADI will not fine for color, will not receive a fine for the allocated lane and will not revoke the taxi license.


February 10, 2017 the law on taxi of the Moscow region was amended:

  1. The lantern is orange on the roof.
  2. The main color of the car is white.
  3. Yellow reflective stripes 15-25 cm wide along the entire body length at least 10 cm from the side windows.
  4. Checkers belt.
  5. Dark gray stripes 15-25 cm wide, located from the lower border of the body, along the entire length of the side surfaces of the body, front and rear bumpers.


These amendments were aimed at reducing the uniformity and recognition of MO taxis. However, government control over these innovations began only by the end of 2017.

On 04 December 2017, all official taxi fleets received a notification. In the notification, they were obliged to provide a photo report for each car for which a taxi license was obtained. If the photos are not provided within 10 days from the date of receipt, the department suspends the taxi license.

From the beginning of January 2019, the Ministry of Transport and Road Infrastructure (MTDI) has suspended more than 500 permits (link to the news on the MTDI website). Now regularly raids are carried out in Moscow and the region by the traffic police and the Ministry of Transport in order to identify violations on this topic.


In this regard, we offer car pasting in accordance with GOST in several versions:


Option number 1. Full pasting .

We apply yellow and gray reflective stripes all over the board and a checkerboard taxi belt on the car.

The cost is 4,500 rubles. Opening hours 1 hour.

This pasting is suitable for those who work constantly.


Option number 2. Magnetic tape .

The magnetic yellow stripe is removable. Consists of four elements on one side.
- Removable magnetic checker belt.
- The gray stripe on the bottom is not removable. The vinyl film is glued to the car in a circle.

This service has become popular relatively recently, and the demand for it is constantly growing, especially in large cities, where car owners have an above average income. If you want to organize for a long time own business in the field of car maintenance, then Car Wrapping is a great idea.

Car wrapping with vinyl is a promising business

"Car Wrapping" literally translates to car packaging. During the wrapping procedure, the body or its individual elements are tightly wrapped with vinyl film. It looks very impressive due to the texture of the film and the drawings on it, and the cost of the procedure will be cheaper than painting a car. The effect of the work done lasts from 5 to 7 years, provided that the film of well-known manufacturers is used. The colors and textures of the films are very diverse, which makes it one of the main types of external tuning for a car, displacing classic airbrushing into the background. And one more advantage - vinyl can be easily removed in the workshop without damaging the paintwork of the vehicle.

What is needed to organize such activities:

  • registration of individual entrepreneurs;
  • room for work;
  • tools and raw materials;
  • advertising company;
  • staff.
Features of the choice of premises

Finding a suitable box is one of the main conditions successful work, because pasting with vinyl requires free space, cleanliness, a certain temperature regime. It is great if you can immediately buy a business premise inexpensively. Otherwise, you will have to pay a monthly rental fee, which can range from 22 to 35 thousand rubles. It is great if the workshop is located in a place where cars are constantly passing - near the highway, near a car market or a huge parking lot. Thanks to this location, you can save a significant amount by avoiding unnecessary advertising costs.

A room with an area of \u200b\u200bat least 50-60 square meters can be considered ideal. This space is enough to service two vehicles at once. The optimum temperature in the box is 20-22 degrees. In winter, it will have to be maintained with heaters. It is worth considering that the walls in the workshop must be painted, and the entrance to it must be equipped with a thermal curtain. Good lighting - one more nuance. About forty fluorescent lamps are to be bought for the agreed area of \u200b\u200bthe box. An important factor when choosing a room is the voltage in the 380 volt network. The wiring must be able to withstand a heavy load with the simultaneous operation of heaters in winter and building hair dryers used to heat the film.

Vinyl Tuning - What Tools Do Business Need?

Now you need to include in the list of investments and costs for tools and quality raw materials. In the arsenal of workers involved in applying vinyl film on cars, there are construction hair dryers with a regulator of air heating power, knives and squeegees. Such a set of tools will cost about 5-7 thousand rubles.

Before applying the film to the car body, the surface is thoroughly processed and degreased. All kinds of detergents, primers and degreasers - something you can't do without. The monthly expenses for these needs will not exceed 3000 rubles.

Vinyl film on a car is not only a raw material, but also a commodity that will bring about twenty percent of a workshop's profit. Vinyl prices vary significantly - from 400 to 3000 rubles per square meter of raw materials. By purchasing vinyl in bulk from official dealers, you will insure yourself and your business against low-quality goods and unnecessary spending.

Workshop workers

Usually two people "wrap" a car with vinyl film. If you have masterfully mastered given view activity, then at first you can independently take part in customer service by taking an assistant. It is desirable that he has some experience in the workshop.

Two people can easily handle two cars at the same time. Since the client is often the designer himself, it makes no sense to hire him. If the customer wants to see the layout of the updated car, he can turn to a third-party company for help. So, the cost of paying wages to employees will be from 30 to 60 thousand.

Advertising costs

An important component successful business - advertising company. Until word of mouth has started working, it is worth investing some funds in it - ordering leaflets, posters, and advertising in local newspapers. Don't neglect free classified ads.

Creating your own website is a great opportunity to announce your activities, as well as show examples of work. Website development will not cost so much - from 5,000 to 20,000 rubles, but you should be ready for monthly investments in its promotion, which will be about 4,000-10,000 rubles.

Expected profit and payback period

Everyone who decided to create a Car Wrapping business tries to calculate the estimated monthly profit as accurately as possible. How profitable is the business of covering cars with vinyl? Considering that it will take 3 days to paste on one car, and you can service two vehicles at the same time, then within a month it is realistic to tune 20 cars. However, not all customers order the entire vehicle to be covered, so we only take into account 10 full covers.

For one order, the consumption of vinyl will be 25 square meters, the average price of which will be 1000 rubles. This means that the consumption of raw materials for 1 car is 25,000. Do not forget that the promotion on the sale of vinyl to the client is 20 percent, which is 5,000 profit. The cost of covering the car will cost the customer the same as the vinyl film itself - 25-30 thousand rubles.

It turns out that from one full order you can earn an average of 30,000. Multiply this amount by 10 orders, we get 300,000 monthly. Subtract from this proceeds running costs - for renting a box (30,000), electricity (3000), advertising (5000-6000), wages personnel (40,000-60000), as well as the purchase of means for processing the body (3000-5000). As a result, we get a net profit in the amount of 196,000. If we consider that the initial one-time investment in this business are about 150,000, then the payback period can be considered small - 2-3 months.

CONTRACT AGREEMENT № ____ Moscow Place to enter the date. , then the person (position) (full name) on the basis (name of the document: protocol, decision) No. in accordance with, on the one hand, responsibility, person (position) (full name) on the basis (document name: protocol , decision) No. in accordance with the Charter, on the other hand, we have concluded this as follows: we call the "Customer", in, acting (s) on from "", and in and the limited company hereinafter referred to as the Contractor in, acting on from "" g. and into the agreement (hereinafter - the Agreement) about 1. Subject of the agreement 1.1. The Contractor undertakes, as instructed by the Customer, to carry out the following work with the Customer's things: - develop and agree on a design layout for pasting the Customer's things; - to carry out pasting of the Customer's thing, in accordance with the approved design layout, by sticking PVC film on the surfaces approved by the parties. hand over its result to the Customer, and the Customer undertakes to accept the result of the work and pay for it. 1.1.1. Description of things that are provided by the Customer for the performance of the work: - car of the brand model ________ body number ____________ - car of the brand model ________ body number ____________ in total: _____________ 1.1.2. The customer is obliged, at the request of the Contractor, to provide things for the performance of the gluing work within the period agreed by the parties, but not later than the date of the end of the contract. 1.1.3. The customer is obliged to provide things, taking into account the following conditions: - the height of the thing must be no more than 3.3 m, otherwise an additional agreement is required to be signed with approval additional conditions carrying out works of increased complexity; - surfaces intended for pasting must not have any dirt, deformations not provided for by the design of the thing, and must be suitable for pasting; - the surfaces of things intended for pasting must be provided in the complete set declared by the manufacturer. 1.1.4. The customer guarantees that he has the right of ownership, or other property rights to the things provided under this Agreement, or with the consent of the owner, which allows him to transfer are his property, or he is authorized by the owner to work on pasting these things. 1.2. Contractor performs work on site Select item at: __________________________ 1.2.1. Mandatory requirements for the place of work: - work must be carried out in a room suitable for pasting things; - the room must be lit; - access to the item being processed must be provided from 1 m on each side; - the air temperature in the room must not be lower than +18 C; - the room must be equipped with 220V electrical outlets; - the room must be clean - at the time of the pasting work, there must be no parallel work in the room, which can hinder the work of the Contractor, including welding, polishing, and the like. 2. Quality of work 2.1. The quality of the work performed must comply with the mandatory requirements established by the Agreement. 2.1.1. The work is considered to be done with high quality if the defects of the work are indistinguishable with the naked eye from a distance of more than 1.5 meters. The customer accepts that as a result of the used work technology, the appearance of defects in pasting caused by objective physical factors (the manifestation of irregularities in the surface color, scratches of the thing, grain of sand under the film, etc.) is possible 2.1.2. The customer has the right to make claims if the planned colors of the materials for pasting do not coincide with the actual ones only if there is a color proof. Without a color proof, claims to the quality of color printing are not accepted. page 1 of 7 Construction contract No. ____ 2.2. Guarantee period. 2.2.1. The parties agreed on a 1 year warranty period for the work result. 2.2.2. The warranty period for works with full-color images without lamination is 24 hours. 2.2.3. The warranty period is calculated from the moment when, according to the terms of the Agreement, the result of the work performed is accepted or must be accepted by the Customer. 2.2.4. The warranty period is extended for a period during which the Customer could not use the result of the work due to defects found in it, provided that the Contractor was notified in writing by the Customer about the discovery of defects within 3 days. 2.2.5. The quality guarantee does not apply to: - pasting bumpers, handles, mirrors, sills, moldings, car windows; - damage caused by the fault of the Customer (poor-quality washing, other work with the car concerning the pasted parts, for example, installing a tee park on a pasted bumper, disassembling a car for noise insulation, etc.) or as a result of emergency or force majeure (accident, hail , fire, vandalism, exposure to chemicals, etc.), damaged by corrosion and unpainted after the restoration of the putty surface. 2.2.6. The Contractor shall not be held liable for any peeling paint or putty from the metal surface of the body, unless this paint or putty is applied by the Contractor himself. 2.2.6. In the event the Customer submits a demand for gratuitous elimination of defects in the work performed in accordance with paragraph 1 of Art. 723 of the Civil Code of the Russian Federation, they must be eliminated by the Contractor within the time period specified in the Customer's request, if this period is reasonable. If the term for the elimination of defects by the Customer has not been assigned, they must be eliminated within a reasonable time from the date of receipt of the Customer's request. 2.2.7. The warranty terminates ahead of schedule if the Customer attempts to eliminate the defects on his own without agreement with the Contractor or if the Contractor is delayed for more than 3 (three) days if a defect occurs. 2.2.8. The guarantee for the work is not issued if the Customer does not comply with the requirements of clause 1.1.3, clause 1.2.1 of the Agreement, about which a note is made in the act of acceptance and transfer of the thing for the pasting work. 2.2.9. The customer is informed that surfaces with a drop (depressions) require technological cuts after laying, for even shrinkage of the film. If the Customer refuses to use the cuts, the guarantee for lifting (swelling) of the film in the recesses does not apply. Refusal to cut is recorded in the acceptance certificate of the work performed. The Customer is notified and accepts that as a result of cutting on the Customer's things, defects in the form of scratches and chips in the coating of the surfaces of the thing may occur. 2.2.10. The Customer undertakes to provide, and the Contractor to accept the pasted over item for control washing and warranty inspection after 7 days from the date of acceptance of the item, but no later than 15 days from the date of acceptance of the work performed. In case of non-fulfillment of this obligation, the Contractor has the right to refuse to provide warranty repairs and to eliminate gratuitous defects that have arisen subsequently. 2.2.11. In the case of ordering an author's design, in accordance with the terms of cl. 3.14 of the Agreement, the Customer receives an additional guarantee, for the period specified in clause 2.2.1 of the Agreement, in the form of free work to eliminate any defects, including those that have arisen through the fault of the Customer, subject to payment for the material to perform the work. 2.2.12. Additional warranty conditions for work and materials used when pasting the Customer's thing, which is a vehicle, are specified in the Appendix to the Agreement. The specified attachment is an integral part of this agreement and is mandatory for signing by the parties only if the thing of the Customer provided for pasting under this Agreement is a vehicle. 3. Design layout 3.1. The Contractor, on the instructions of the Customer, undertakes to develop a design layout for pasting the Customer's things, and the Customer undertakes to accept and pay for its production in accordance with the terms of this Agreement. 3.2. The Customer's Assignment (hereinafter the Assignment) is drawn up on hard copy and approved by the signatures of the parties. The assignment is an integral part of the Agreement. 3.3. The contractor performs work on the creation of a design layout in the following order: - formation of the Task by collecting the necessary information - up to 7 days from the date of conclusion of the Agreement. The generated Task is signed by the parties at a direct meeting of the representatives of the parties, or sent to in electronic format to the Customer's e-mail box (hereinafter referred to as the Customer's mailbox) specified in this Agreement. The Customer prints, signs, scans the Task with his signature and sends it to the Contractor's e-mail box (hereinafter referred to as the Contractor's mailbox) specified in this Agreement. The parties have established that the signed electronic copies documents are valid until they are replaced by originals. Replacement of copies of the Assignment with originals occurs no later than the signing of the acceptance certificate for the transfer of the work performed on pasting the Customer's things. page 2 of 7 Work contract № ____ - development of preliminary sketches - up to 15 days from the date of approval of the Task. The preliminary sketches are approved by sending them to the Customer's mailbox. If the Customer does not provide comments on the preliminary sketch within 2 days, the preliminary sketch is considered agreed. If the Customer provides comments on preliminary sketches, the Contractor is obliged to correct the preliminary sketches within 15 days, taking into account the Customer's comments. - development of sketches - up to 15 days from the date of approval of preliminary sketches. The developed sketches are sent to the Customer's mailbox. The customer either approves the sketches or sends his comments on the sketches within 2 days. If the Customer does not receive a response to the Contractor's mailbox within the specified period, the sketches are considered agreed, and the work on their implementation accepted. If comments are received from the Customer, taking into account clause 3.4. Of the Agreement, the Contractor is obliged to take them into account and carry out work to correct the sketches within up to 10 days. If the Customer makes significant changes to the sketches, in accordance with clause 3.4. Of the Agreement, the Contractor within 2 days from the date of receipt of additional payment for significant changes, the Contractor begins work on the implementation of changes from the stage of development of preliminary sketches. - signing of the design layout - up to 4 days from the moment of approval of the sketches. The Contractor prints out the design layout, signs it, scans it, and sends the signed electronic copy to the Customer's mailbox. The Customer prints out the design layout, signs it, scans and sends the signed electronic copy to the Contractor's mailbox. The parties have established that the signed electronic copies of the documents are valid until they are replaced by the originals. Replacement of copies of the Task and the design layout with the originals occurs no later than the signing of the acceptance certificate for the transfer of the work performed for pasting the Customer's things. The documents specified in this clause may be signed by the parties in hard copy directly at the time of their preparation. In this case, electronic copies of documents may not be sent. 3.4. The Customer has the right to make minor changes or edits to the Assignment or sketches. These amendments and changes must be described clearly, expanded and reasoned, otherwise the Contractor has the right to refuse to make the changes. 3.5. In case of making significant changes to the Task on the initiative of the Customer, the Customer pays the fee provided for in clause 6.1. Re-contract. The provisions of this paragraph do not apply to the stage of performing work on the creation of preliminary sketches. 3.6. A significant change in the Assignment is a change in the subject of the sketch, a change entailing a change in the technology for making materials and pasting, a change in the style of the design layout. 3.7. The design layout must contain the date and place of signing, details of the Customer's thing, the cost of pasting, graphic image and the layout of individual elements, an indication of this Agreement. 3.8. The design layout approved by the Customer is an integral part of this Agreement. 3.9. The Contractor has the right to place over the drawing, or in any other place on the Customer's things, an indication that the work was carried out by the Contractor, in the form of an Internet site address: Namashinu.ru or the inscription "stylingby namashinu.ru" in the style chosen by the Contractor. The size of this indication should not exceed an area of \u200b\u200b0.02 m2 on each side of the item. When the size of the indication is more than 0.2 m2, and its placement on the windshield and rear window of the customer's belongings, if given thing is a vehicle, the Customer is entitled to a discount from the cost of work under this contract in the amount of: 30%. 3.10. All exclusive rights to images, design layout and other graphic elements belong to the Contractor and are transferred to the Customer under the right of a perpetual non-exclusive license. The customer does not have the right to transfer these rights to third parties, as well as to change, use the design layout for pasting other things not specified in this contract, belonging to the customer or third parties. 3.11. In case of violation of the rules specified in clause 3.3. Of the Agreement, the Customer undertakes to pay the Contractor a fine three times the cost of the design, and compensate for lost profits in the amount of the cost of services under this agreement. 3.12. The Customer undertakes to cooperate in the process of making a design layout, by providing comments and explanations, as well as information necessary for the development of a design layout at the request of the Contractor, sent to the Customer's mailbox. The Customer undertakes to send the specified comments and explanations to the Contractor's mailbox. 3.13. If, at the request of the Customer, the design layout includes a logo, the Customer is obliged to present it in curves (in * .eps or * .cdr format, grouped by color) if required by the design assignment. If the logo is not provided in curves, the Contractor draws it himself. The cost of the works specified in this clause is 7000 rubles, which are paid by the Customer separately on the general terms of this Agreement. page 3 of 7 Construction contract No. ____ 3.14. At the request of the Customer, the Contractor can develop a design layout with a complex author's design. What is noted in the Task. 4. Production of materials. 4.1. Within 5 days from the date of receipt of the prepayment provided for in clause 6.4. Of the Agreement, the Contractor sends the design layout to the printing house of his own choice to receive materials intended for pasting the Customer's things. 4.2. The contractor is obliged to produce and provide materials no later than 40 days from the date of approval of the design layout. 4.3. The cost of production of materials is included in the cost of work under this contract. 5. Performance of work on pasting 5.1. After the materials for pasting the Customer's things are made, the Contractor undertakes to agree on a specific time for the pasting of the Customer's things by sending an application to the Customer's mailbox, but no later than 30 days from the date of production of the materials for pasting. 5.2. The contractor undertakes to provide all materials and equipment necessary to carry out the work. 5.3. The Customer undertakes to provide the Contractor within the agreed time with a thing for the gluing work in the place agreed by the parties. If the Customer fails to fulfill this obligation, the Contractor shall have the right to demand an extension of the terms for the performance of work and an increase in the price of the work specified in the Agreement by 25% of the agreed price of the work. In cases where the performance of work under the Agreement has become impossible due to actions or omissions of the Customer, the Contractor reserves the right to receive payment according to the price specified in the Agreement, taking into account the work performed. 5.4. The risk of accidental loss or accidental damage to the thing transferred for processing and other property provided by the Customer shall be borne by the Customer. The Contractor bears the risk of accidental loss of or accidental damage to materials, equipment and other property provided by the Contractor. If the Customer has delayed the obligation to provide the thing for pasting by more than 2 weeks, the risk of accidental destruction of the materials passes to the Customer. 5.5. The Contractor has the right to involve other subcontractors in the performance of his obligations under the Agreement. 5.6. The Contractor shall be liable for the failure to preserve the thing or other property of the Customer transferred for processing, which is in the possession of the Contractor in connection with the performance of the Agreement. 5.7. The Contractor has the right not to start work, and to suspend the work begun in cases where the violation by the Customer of the obligations under the Agreement, in particular the failure to provide the thing to be processed, prevents the Contractor from fulfilling the Agreement, as well as in the presence of circumstances that clearly indicate that these obligations will not be fulfilled within the prescribed period (Article 328 of the Civil Code of the Russian Federation). 5.8. The customer is notified and accepts the fact that in the places of the protruding parts of the body, during application, the film will be technologically cut. These places include, but are not limited to: - for trucks: framing corners along the contour of the body, rear door heels, an information plate with a body number, rear door mountings, nameplates. - for minibuses: mechanical runners, door handles, rubber bands around windows, nameplates. - for cars: door handles, rubber bands around windows, nameplates. 5.9. If the work on pasting the Customer's things is carried out on the territory of the Customer, the Customer undertakes to provide free access to the Contractor's employees, as well as free movement of equipment necessary to fulfill the obligations under this Agreement. 6. Price of work and payment procedure 6.1. The price of work on the development of a design layout specified in clause 3.1. Of the Agreement, is agreed by the parties in the Assignment for the production of a design layout. 6.2. The price of the work on pasting the Customer's things is agreed by the parties in the design layout at the time of its approval. 6.3. The Customer has the right to apply to the Contractor with a request to fulfill an urgent order. An urgent order is the production of materials for pasting within two working days after the layout has been agreed and the Customer's thing is pasted on the next working day or one day after the layout is made. In this case, page 4 of 7 Contract No. ____ of the Contractor, when fulfilling an urgent order, has the right to demand from the Customer a double payment of the price of work and materials set by the parties 6.4. The customer undertakes to pay for the work on the development of the design layout within 2 working days from the date of approval of the Task 6.5. The customer undertakes to pay for the work of pasting things, in the amount of 70% of the amount approved in the design layout within 2 days from the date of approval of the design layout. The remaining amount of 30% is payable within 2 days from the moment of signing the acceptance certificate for the transfer of the pasting work performed. 6.6. The price of the work is approximate. Without agreement with the Customer, an insignificant excess of the price of work is allowed in connection with additional work or an increase in the cost of materials and equipment provided by the Contractor, as well as services provided to the latter by third parties. A significant excess of the price of work is allowed only with the written consent of the Customer. The excess of the work price specified in the Agreement by more than 25% is considered significant. The work acceptance certificate is considered the Customer's consent to exceed the work price only if the following conditions are met: - the excess amount is indicated in the act; - the act reflects the reason for the excess; - the act is signed by the Customer without comments on the volume, quality of work and the amount of excess. 6.7. Settlements under the Agreement can be made in the following ways: - by depositing cash money Contractor; - payment orders. 6.8. The Customer's obligation to pay is considered fulfilled at the time the funds are credited to the correspondent account of the Contractor's bank or the Customer pays funds directly to the Contractor. 7. Acceptance of the completed work 7.1. The Contractor notifies the Customer personally, by phone or by sending a notice to the Customer's mailbox, about the completion of the work and readiness to accept it. The parties agreed that in order to confirm the fact of sending a notice of acceptance of the work result, the Contractor only needs to provide a printout of the Contractor's calls to the Customer's number specified in this Agreement, or a notarized protocol of inspection of the Contractor's mailbox. 7.2. The Customer is obliged, with the participation of the Contractor, to inspect and accept the work performed (its result), and if any deviations from the Agreement that worsen the result of the work or other shortcomings in the work are found, immediately notify the Contractor about it. 7.3. The risk of accidental death or accidental damage to the result of the work performed before its acceptance is borne by the Customer. 7.4. In the event that the work on pasting things is carried out at the Contractor's place, the Customer is obliged to pay the Contractor for excess idle time at the rate of 50 rubles / hour, starting from 25 hours from the moment the Customer is notified of the need to accept the work performed. This obligation does not apply to cases when the thing is in the place of the Contractor in excess of the standard due to his fault. 7.5. The customer does not have the right to refer to obvious defects after the acceptance of the work on pasting the thing, provided for in this Agreement. 8. Responsibility of the parties 8.1. Losses caused by the Contractor shall be reimbursed in an amount not exceeding the cost of rendering services under this Agreement. 8.2. In case of delay by the Customer in the transfer of the thing for the Contractor to perform the work stipulated by the contract, the Contractor has the right to demand from the Customer a forfeit in the amount of 4780 rubles. for each hour of downtime of each representative of the Contractor, starting from 20 min. from the moment of arrival of the Contractor's representatives until the actual fulfillment by the Customer of its obligation to provide the thing for the work by the Contractor. In this case, the downtime is more than 20 minutes. each next hour is rounded to the nearest full hour. Downtime less than 20 minutes. every next hour is not paid. The specified penalty applies to cases when the Contractor's representatives actually arrived at the place of performance of the contract, determined by the Customer. 8.3. Payment of the penalty by the Customer. 8.3.1. In case of delay in payment for the work performed, the Contractor has the right to demand payment by the Customer of a penalty in the amount of 3% of the amount owed for each day of delay. page 5 of 7 Construction contract No. ____ 8.3.2. In case of delay in the provision by the Customer of the thing to be processed, the Contractor shall have the right to demand payment of a penalty in the amount of 3% of the price of the work for each day of delay. 8.3.3. In case of evasion of acceptance of the work performed, the Contractor has the right to demand payment by the Customer of a fine in the amount of the contract price. 8.4. The contractor has the right to demand recovery from the Customer of losses in full in excess of the penalty (penalty). 8.5. In case of incorrect information on the body surface provided by the Customer (the condition of the body does not allow to correctly apply the image and / or instead of the awning a rigid body is provided or instead of the designated rigid body, - an awning), one of the following decisions is made by agreement between the Customer and the Contractor: per car, while warranty obligations The contractor is terminated. - The customer pays for the re-production of the correct product; incorrect products manufactured earlier, through the fault of the Customer, are taken by the Customer on their own. 9. Modification and termination of the agreement 9.1. The parties have the right at any time to change or terminate the Agreement by mutual agreement. 9.2. The Customer is not entitled to unilaterally refuse to execute the Agreement in accordance with Art. 717 of the Civil Code of the Russian Federation. 10. Dispute Resolution 10.1. Claim procedure for resolving disputes 10.1.1. Prior to filing a claim arising from the Agreement, the party that considers that its rights have been violated (hereinafter referred to as the interested party) is obliged to send a written claim to the other party. 10.1.2. The claim must contain the requirements of the interested party and their justification, indicating the norms of legislation and (or) the terms of the Agreement violated by the other party. Copies of documents confirming the circumstances stated in it must be attached to the claim. 10.1.3. The party that received the complaint is obliged to consider it and, within Select element days, send a written reasoned response to the other party. 10.1.4. In case of failure to receive a response within the specified time period or disagreement with the response, the interested party has the right to apply to the court. 10.2. A claim arising from this Agreement shall be filed with an arbitration court in accordance with the rules of jurisdiction provided by law. 11. Final Provisions 11.1. The contract comes into force and becomes binding on the parties from the moment of its conclusion and is valid until the place for entering the date. 11.2. All annexes to the Agreement are its integral part. 11.3. In order to receive timely notification, the parties undertake to check their own mailboxes at least 1 time daily from 8 to 18 hours. 11.4. If the Customer is individualacquiring work for personal, family and other needs not related to entrepreneurial activity, and the relationship between the Customer and the Contractor is subject to the Federal Law "On Protection of Consumer Rights", conditions that do not meet or directly contradict the requirements of the specified law are void. In this case, the requirements of the Federal Law "On Protection of Consumer Rights" and other legislation of the Russian Federation in the field of consumer protection are applied. page 6 of 7 Contract No. ____ 12. Customer Addresses and details of the parties Contractor Limited Liability Company Location: Name: Location: Postal address: Postal address: Phone Telephone Fax Fax E-mail PSRN INN KPP P / s in K / s BIK on behalf of the Customer: (position) (signature) / (full name) M.P. / E-mail PSRN INN KPP R / s in K / s BIK on behalf of the Contractor: (position) (signature) / (full name) M.P. page 7 of 7 /

Many have long dreamed of starting their own business. But, in order to start the first steps in this difficult path, sometimes there is no competent idea, determination and start-up capital... We bring to your attention Car Wrapping. This combination of words hides a perfectly understandable procedure.

Translated from of English language, "Wrapping" means packaging. Car Wrapping is the wrapping of a car in vinyl. It is a less expensive way to update the car's appearance than traditional painting.

For example, the cost of matte painting is from 60 thousand rubles, while "wrapping" will cost an order of magnitude cheaper - 45 thousand rubles. The effect of Car Wrapping is often more colorful due to the texture and pattern of the coating. Films of this kind can maintain proper appearance for 7 years.

In order to open this kind of business, it is necessary at the first stage to register individual entrepreneur for VAT. When passing the registration procedure, In the Species Classifier economic activity you must specify " maintenance cars ".

At first, you will need a rented space (in good condition), supplies, a set of tools, and a small mass media campaign. Unit costs in this case can range from 90 to 110 thousand rubles.

Let's say you already have all of the above, the next step is to general cleaning, as well as cosmetic repairs (painting walls, ceiling and floor with water-repellent paint). The entrance to the box must be closed with a thermal curtain.

This is the cheapest method for removing dust. High-quality lighting also plays an important role. To do this, you must use fluorescent lamps, which should be located on the ceiling and walls. The optimal amount is up to 40. In some workshops, such devices are compensated by the use of spotlights.

To ensure that tools and materials are always at hand, it is recommended to install several conventional racks. In the end, the cost of preparing a working room will cost about 30 thousand rubles. In the future, cleaning should be done regularly. It is not necessary to decorate the box, but if regalia appear in the process of work, then why not brag about them.

The list of necessary tools includes industrial hair dryers, knives and squeegees (a special tool that removes pimples when applying a film). The key element here is the hair dryer, which must have a temperature regulator and disperse the streams of warm air. A hair dryer worth 2 thousand rubles is enough for a year of trouble-free operation.

A set of other instruments will cost approximately 3 thousand rubles. In addition, do not forget about the special tools needed to prepare the surface on which the film will be applied (primers and degreasers). All this can be purchased at specialized hardware stores.

Monthly for the purchase of consumables, implementation preventive work, electricity will go to just over 3 thousand rubles. This figure was taken on the basis of 10 orders.

The key material in this case is the film itself. Vinyl or polyurethane film is not ordinary consumable, but the products that the workshop sells to the consumer with some extra charge. Wrap up should be approximately 20% of the cost of raw materials. It is best to use films from renowned manufacturers.

Materials of American, British, Italian, French and Japanese companies are not only an order of magnitude better than their Chinese and Korean counterparts, but are also available in a richer assortment. Their cost is higher, respectively, you can squeeze more out of them.

Price for 1 sq. m. of film can fluctuate between 300-3000 rubles. For 300 rubles, you can purchase the most common glossy or matte finish, for a textured carbon-like coating you will have to pay from 1000 to 1500 rubles. The cost of the film for gold or chrome starts at 2,000 rubles. It is optimal to purchase film from authorized dealers and representatives.


Chrome film costs from 2,000 rubles per 1 sq. m.

Future staff

The work is carried out in several stages - order formation, installation and dismantling of removable elements (side mirrors, door handles, etc.), surface preparation, film sticker. Formation of the order is assigned to the manager, whose role is performed, as a rule, by the owner.

A mechanic is needed to work with removable elements, and a gluer with an assistant to apply the film. In fact, two people can cope with this, since the operations have a clear sequence, respectively, the number of employees does not in any way affect the speed of order execution.

There is no strict need for a designer, since the customer is himself, otherwise the design is developed by a third-party company, the payment of which is borne by the client. The cost of creating a layout ranges from 1,000 to 5,000 rubles.

Assembly and disassembly of the car frame does not require serious qualifications; even an experienced motorist can perform these procedures. In state educational institutions there is no training for specialists in working with automotive films. All subtleties are studied in private courses. The minimum training course is 3 days, its cost is 25 thousand rubles.

Owner similar business he can either master the profession of a gluer himself, or find a third-party master and pay him a salary. In addition, it is likely that it will be necessary to share income with the gluer, since the cost of work is almost always linked to the cost of consumables. In such a situation, the employee unwittingly becomes a partner, who gets almost half of the profit.

Prospects for the future

When the business becomes popular, an additional range of services can be offered. Recently, vinylography has begun to enjoy serious popularity - the application of a pattern that is printed on vinyl film on the smooth surfaces of a car body. Additional services should also include car polishing.


Stages of work on the machine - duration 2 - 3 days

Room selection

Theoretically, you can organize your own workshop in an ordinary garage, but practice proves that it is quite difficult to do this. Residents of nearby houses will not be particularly delighted with your activity, if the garage is located in a residential area, or neighbors in the garage cooperative will show their dissatisfaction.

Pasting film requires a lot of space, which is not so much in a regular garage. In addition, during technological process, dust and moisture must not get on the car body. Therefore, outdoor work is fraught with not only dissatisfaction, but also marriage.

For a comfortable organization, the area of \u200b\u200bthe premises should be at least 60 sq. m. This will be enough to locate two cars at once, and the craftsmen will be provided with hassle-free access to all areas. In addition, there is a place for storing consumables.

The room is equipped with a simple one. It is optimal that the voltage of electricity is 380 V, since large amounts of electricity are needed for hair dryers and lighting. The presence of sewerage and water supply will only be a plus. It is better to organize business in large cities, due to the presence of more transport, but in the provinces you can also find a clientele.

If we approach the location of the premises from the point of view of marketing, then there are no clear priorities. For clients there is not much difference whether it takes 10 minutes or an hour to get to a one-time service.

Therefore, when choosing a box, first of all, you should focus on its rental value. True, in places where there is a congestion of motorists, they are more preferable (garages, car markets, gas stations, etc.), since the workshop will immediately fall into the attention of potential customers.

What benefits can you get

The order is completed within 2-3 days. However, it is necessary to take into account the period of the year (in winter, one additional day must be allocated). During this time, two cars lend themselves to "wrapping". While one car is being cleaned, the second can be wrapped.

While the wrapped car is in the sump, the film is applied to the second car. In this case, about 10-30 cars can be wrapped in a month. Some clients order a full wrap, others order individual body components. Therefore, when calculating profit, we will take 10 "full" orders.

The consumption of raw materials directly depends on the class of the car and the specific components to be glued. In our case, we will focus on the complete "wrappling", which requires an average of 25 square meters. m. of film. The prime cost of the film is about 500 and 1000 rubles per 1 sq. m respectively.

On average, it turns out 700 rubles per "square", add here 20% of the markup (140 rubles) and at the end we get the total cost of the film, which will go to cover the entire car - 3500 rubles.

The cost of the work is the same as the material will cost the client - 21 thousand rubles. Thus, one car can earn 24.5 thousand rubles, and 245 thousand rubles a month.

Do not forget that monthly expenses are deducted from this amount - box rental (22 thousand rubles), money for advertising campaign (6.5 thousand rubles), electricity (3.5 thousand rubles). If you don't want to mess with the film yourself, then we add here the salary of two masters - 30 thousand rubles.

The total is a net profit of 183 thousand rubles. A similar profit can be obtained after six months of work.

Winning customer trust

Vinyl tuning is not cheap. Such a cosmetic operation occurs once every few years, sometimes once in a lifetime. Consequently, the war for customers will be ongoing.

Given the unprecedented growth information technologiesmost effective method promotion is a web resource. On the site you can place a price list, contacts, as well as, in addition, various informative articles on rapping and portfolio. In this case, it is additionally necessary to create workshop pages in popular social networks.

The cost of website development ranges from 3000-25000 rubles. Additionally, you will need to spend from 3 to 10 thousand rubles for promotion monthly, as well as for updating information on social networks. Of course, you can do all this yourself, but by outsourcing, you are guaranteed to get a high-quality result.

When you are well promoted, you will need to take part in various automotive events - exhibitions, etc. Therefore, you always need to be prepared for unforeseen expenses.

At first, when the company is still little known, the main key to success will be the cost of the service. Various discounts will be weighty arguments in favor of choosing a workshop, and will also allow you to work in a plus. It is optimal that bonus program lasted for 6 months. Such actions are especially relevant in the winter period, when the demand for this service is seriously falling.

In addition to cost, customers can be enticed by the speed of work. For example, chrome plating of the body should be carried out in the same time frame as the usual pasting with a film, that is, in three days. As bonuses, you can offer a number of additional services - tinted headlights with light-transparent film.

 

It might be helpful to read: